My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.11.17 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2020
>
2020.11.17 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 10:57:36 AM
Creation date
2/18/2021 10:45:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Plan & Nonconforming Use Variance Review – Jamatar II LLC and Everest Properties LLC <br />Planning Commission Report; 11-17-20 <br /> <br /> <br /> <br /> Page 6 <br /> <br />4. Replacement Parking for Building A – The ten parking spaces in the SE corner of the <br />property will now be relocated to the following two areas under new easements. Both areas <br />will be significantly more conveninent and accessible for visitors to Building A. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />5. Additional Parking for Building C – Available parking for building C currently located in <br />the proposed fenced in storage area will now be relocated just to the east of building C. <br /> <br />6. Improvments to stormwater and snow melt drainage for all area buildings (not shown). <br />The applicant will work with the City Engineer on needed improvements to ensure drainage <br />works for all area properties. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />A <br />B <br />C
The URL can be used to link to this page
Your browser does not support the video tag.