Item No.Item Units Quantity Unit Price Amount <br />1 MOBILIZATION LS 1 18,000$ 18,000$ <br />2 CLEARING AND GRUBBING LS 1 2,500$ 2,500$ <br />3 REMOVE CURB AND GUTTER LF 950 3$ 2,850$ <br />4 REMOVE BITUMINOUS PAVEMENT SY 2,700 3$ 8,100$ <br />5 REMOVE CONCRETE WALK SY 1,350 2$ 2,700$ <br />6 MISCELLANEOUS REMOVALS LS 1 5,000$ 5,000$ <br />7 PAVEMENT SAWING LF 150 5$ 750$ <br />8 COMMON EXCAVATION CY 1,900 13$ 24,700$ <br />9 CLASS 5 AGGREGATE BASE (10")TON 1,200 17$ 20,400$ <br />10 SELECT GRANULAR BORROW (2')CY 1,600 12$ 19,200$ <br />11 4" CONCRETE WALK SF 6,300 6$ 37,800$ <br />12 CONCRETE CURB AND GUTTER LF 1,800 12$ 21,600$ <br />13 CONCRETE DRIVEWAY REPLACEMENT EA 1 3,500$ 3,500$ <br />14 WEARING COURSE MIX (2")TON 210 65$ 13,650$ <br />15 NON WEARING COURSE MIX (4")TON 420 62$ 26,040$ <br />16 PEDESTRIAN CURB RAMP EA 3 2,000$ 6,000$ <br />17 STORM SEWER IMPROVEMENTS LS 1 25,000$ 25,000$ <br />18 UTILITY IMPROVEMENT ALLOWANCE LS 1 15,000$ 15,000$ <br />19 DRAIN TILE (UNDER CURB)LF 1,800 8$ 14,400$ <br />20 RETAINING WALL REPAIR ALLOWANCE LS 1 10,000$ 10,000$ <br />21 TURF ESTABLISHMENT (SEED/SOD AND TOPSOIL)SY 1,100 5$ 5,500$ <br />22 EROSION CONTROL LS 1 5,000$ 5,000$ <br />23 TRAFFIC CONTROL LS 1 5,000$ 5,000$ <br />24 INTERSECTION LIGHTING LS 1 25,000$ 25,000$ <br />25 STRIPING LF 1 2,500$ 2,500$ <br />26 SIGNING LS 1 2,500$ 2,500$ <br />Subtotal 291,240$ <br />10% Construction Contingency 29,000$ <br />TOTAL ESTIMATE CONSTRUCTION COST 320,000$ <br />1 Assumed to be 5% of construction cost. <br />9,10,14,15 Pavement section assumed is 6" bituminous, 10" aggregate base, and 24" select granular borrow. <br />11 Includes aggregate base, all median pavement, and center circle paving. <br />18 Includes necessary sanitary sewer adjustments and hydrant/watermain adjustments. <br />19 <br />COST ASSUMPTIONS: <br />Allowance for repairs/improvements to retaining wall in SE corner of 8th Avenue and 8th Street. <br />No stormwater BMP/treatment improvements are included with the estimate. <br />AREA 4 - MINI-ROUNDABOUT AT THE INTERSECTION OF 8TH STREET NW AND 8TH AVENUE NW INCLUDING THE RECONSTRUCTION OF <br />4, 125-FOOT LONG APPROACHES <br />CITY OF NEW BRIGHTON <br />AREA 4 - 8TH AVE NW AND 8TH ST NW MINI-ROUNDABOUT <br />CONCEPTUAL OPTIONION OF PROBABLE COST