Item No.Item Units Quantity Unit Price Amount <br />1 MOBILIZATION LS 1 15,000$ 15,000$ <br />2 CLEARING AND GRUBBING LS 1 2,500$ 2,500$ <br />3 REMOVE CURB AND GUTTER LF 900 3$ 2,700$ <br />4 REMOVE BITUMINOUS PAVEMENT SY 2,000 3$ 6,000$ <br />5 REMOVE CONCRETE WALK SY 1,350 2$ 2,700$ <br />6 MISCELLANEOUS REMOVALS LS 1 5,000$ 5,000$ <br />7 PAVEMENT SAWING LF 150 5$ 750$ <br />8 COMMON EXCAVATION CY 1,350 13$ 17,550$ <br />9 CLASS 5 AGGREGATE BASE (10")TON 1,000 17$ 17,000$ <br />10 SELECT GRANULAR BORROW (2')CY 1,200 12$ 14,400$ <br />11 4" CONCRETE WALK SF 4,800 6$ 28,800$ <br />12 CONCRETE CURB AND GUTTER LF 1,400 12$ 16,800$ <br />13 CONCRETE DRIVEWAY REPLACEMENT EA 1 3,500$ 3,500$ <br />14 WEARING COURSE MIX (2")TON 175 65$ 11,375$ <br />15 NON WEARING COURSE MIX (4")TON 350 62$ 21,700$ <br />16 PEDESTRIAN CURB RAMP EA 3 2,000$ 6,000$ <br />17 STORM SEWER IMPROVEMENTS LS 1 25,000$ 25,000$ <br />18 UTILITY IMPROVEMENT ALLOWANCE LS 1 15,000$ 15,000$ <br />19 DRAIN TILE (UNDER CURB)LF 1,400 8$ 11,200$ <br />20 TURF ESTABLISHMENT (SEED/SOD AND TOPSOIL)SY 1,100 5$ 5,500$ <br />21 EROSION CONTROL LS 1 4,000$ 4,000$ <br />22 TRAFFIC CONTROL LS 1 4,000$ 4,000$ <br />23 INTERSECTION LIGHTING LS 1 25,000$ 25,000$ <br />24 STRIPING LF 1 2,500$ 2,500$ <br />25 SIGNING LS 1 2,500$ 2,500$ <br />Subtotal 240,275$ <br />10% Construction Contingency 24,000$ <br />TOTAL ESTIMATE CONSTRUCTION COST 264,000$ <br />1 Assumed to be 5% of construction cost. <br />9,10,14,15 Pavement section assumed is 6" bituminous, 10" aggregate base, and 24" select granular borrow. <br />11 Includes aggregate base, all median pavement, and center circle paving. <br />18 Includes necessary sanitary sewer adjustments and hydrant/watermain adjustments. <br />CITY OF NEW BRIGHTON <br />AREA 3 - 8TH AVE NW AND 7TH ST NW MINI-ROUNDABOUT <br />CONCEPTUAL OPTIONION OF PROBABLE COST <br />COST ASSUMPTIONS: <br />No stormwater BMP/treatment improvements are included with the estimate. <br />7th Street NW east of 8th Avenue NW is included in area 5 estimate. <br />AREA 3 - MINI-ROUNDABOUT AT THE INTERSECTION OF 8TH AVE NW AND 7TH STREET NW INCLUDING THE RECONSTRUCTION OF 3, <br />125-FOOT LONG APPROACHES