My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.02.11 CC Packet
NewBrighton
>
Council
>
Packets
>
2020
>
2020.02.11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:46:02 AM
Creation date
2/28/2021 11:29:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No.Item Units Quantity Unit Price Amount <br />1 MOBILIZATION LS 1 8,000$ 8,000$ <br />2 LIGHTING UNIT EA 16 6,000$ 96,000$ <br />3 LIGHTING UNIT FOUNDATION EA 16 750$ 12,000$ <br />4 WIRING AND CONDUIT LF 1,400 5$ 7,000$ <br />5 SERVICE CABINET AND EQUIPMENT EA 1 12,000$ 12,000$ <br />Subtotal 135,000$ <br />10% Construction Contingency 14,000$ <br />TOTAL ESTIMATE CONSTRUCTION COST 149,000$ <br />1 Assumed to be 5% of construction cost. <br />2 <br />COST ASSUMPTIONS: <br />Lighting unit spacing assumed at 75-feet on both side of Old Hwy 8. <br />AREA 2 - OLD HWY 8/8TH AVENUE NW INTERSECTION TO 6TH AVENUE NW. <br />CITY OF NEW BRIGHTON <br />AREA 2 - OLD HWY 8 LIGHTING IMPROVEMENTS <br />CONCEPTUAL OPTIONION OF PROBABLE COST
The URL can be used to link to this page
Your browser does not support the video tag.