My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.02.11 CC Packet
NewBrighton
>
Council
>
Packets
>
2020
>
2020.02.11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:46:02 AM
Creation date
2/28/2021 11:29:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No.Item Units Quantity Unit Price Amount <br />1 MOBILIZATION LS 1 7,000$ 7,000$ <br />2 COMMON EXCAVATION CY 375 13$ 4,875$ <br />3 CLASS 5 AGGREGATE BASE (7")TON 400 17$ 6,800$ <br />4 4" CONCRETE WALK SF 1,250 6$ 7,500$ <br />5 CONCRETE CURB AND GUTTER LF 475 12$ 5,700$ <br />6 WEARING COURSE MIX (2")TON 125 65$ 8,125$ <br />7 NON WEARING COURSE MIX (3")TON 190 62$ 11,780$ <br />8 PEDESTRIAN CURB RAMP EA 2 2,000$ 4,000$ <br />9 STORM SEWER MANHOLE/CATCH BASIN EA 4 3,000$ 12,000$ <br />10 STORM SEWER PIPE LF 250 40$ 10,000$ <br />11 WATERMAIN LF 225 50$ 11,250$ <br />12 HYDRANT AND VALVE EA 1 7,500$ 7,500$ <br />13 DUCTILE IRON FITTINGS LB 1,000 8$ 8,000$ <br />14 TURF ESTABLISHMENT (SEED/SOD AND TOPSOIL)SY 300 5$ 1,500$ <br />15 EROSION CONTROL LS 1 2,500$ 2,500$ <br />16 TRAFFIC CONTROL LS 1 1,000$ 1,000$ <br />17 STRIPING LF 1 2,000$ 2,000$ <br />18 SIGNING LS 1 1,000$ 1,000$ <br />Subtotal 105,530$ <br />10% Construction Contingency 11,000$ <br />TOTAL ESTIMATE CONSTRUCTION COST 117,000$ <br />1 Assumed to be 5% of construction cost. <br />2 <br />3,4,7,8 Pavement section assumed is 5" bituminous, and 7" aggregate base. <br />4 5-foot wide sidewalks are assumed. Includes aggregate base. <br />12,13 Assumes watermain to be extended off 8th Avenue NW to serve the development. <br />No utility extensions for future development are included with the estimate. <br />CITY OF NEW BRIGHTON <br />AREA 6 - 8TH AVENUE NW EXTENSION INTO DEVELOPMENT <br />CONCEPTUAL OPTIONION OF PROBABLE COST <br />COST ASSUMPTIONS: <br />Assumed as 1' depth over roadway area and 1' depth over median and sidewalk areas. <br />Site demolition and associated removal costs are not included with this estimate. This estimate reflects construction costs of the 8th <br />Avenue NW extension assuming the site is prepped for construction. <br />No stormwater BMP/treatment improvements are included with the estimate. <br />AREA 6 - EXTENSION OF 8TH AVENUE NW FROM INTERSECTION OF OLD HWY8 AND 8TH AVENUE NW TO 200-FEET SOUTHEAST OF <br />THE INTERSECTION
The URL can be used to link to this page
Your browser does not support the video tag.