My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.02.11 CC Packet
NewBrighton
>
Council
>
Packets
>
2020
>
2020.02.11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:46:02 AM
Creation date
2/28/2021 11:29:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />kimley-horn.com 767 Eustis Street, Suite 100, Saint Paul, MN 55114 651 645 4197 <br /> <br />October 22, 2019 <br /> <br /> <br />Mr. Craig Schlichting, P.E. <br />Director of Community Assets and Development <br />City of New Brighton <br />803 Old Highway 8 NW <br />New Brighton, MN 55112 <br /> <br />Re: Professional Services Agreement for Preliminary and Final Design Services <br /> Old Hwy 8 and 8th Avenue NW Preliminary and Final Design <br /> <br />Dear Mr. Schlichting: <br /> <br />Kimley-Horn and Associates, Inc. (“Kimley-Horn” or “Consultant”) is pleased to submit this Professional <br />Services Agreement to the City of New Brighton (“Client”) for the Old Highway 8 And 8th Avenue NW <br />Preliminary and Final Design Services. Our project understanding, scope of services, schedule, and <br />estimated fee are provided below. <br /> <br />Project Understanding <br /> <br />We understand that the City is planning for the development of an apartment complex, senior living <br />facility, and townhome development adjacent to the Old Highway 8 and 8th Avenue NW intersection. <br />As part of the redevelopment scenario, the City is considering improvements to the intersection and <br />surrounding roadways to accommodate projected traffic needs and improve pedestrian and bike <br />connectivity. As part of any improvements, the City wants to evaluate future improvements planned for <br />the area including the conversion of Old Highway 8 from the current 5-lane section to a 3-lane section. <br />and the extension of 8th Ave. NW south to 5th Street NW. <br /> <br />The City of New Brighton would like to complete the preliminary design for the following improvements <br />within the preliminary design study area: <br /> <br /> Reconstruction of Old Highway 8 from 5th Street NW to 5th Avenue NW converting to a 3-lane <br />section. <br /> Extension of 8th Avenue NW from Old Highway 8 to 5th Street NW within existing City property. <br /> Identification of a typical section for the Old Highway 8 railroad bridge between 5th Avenue NW <br />and 8th Avenue NW. <br /> <br />The City of New Brighton would like to complete final construction plans for intersection improvements <br />at the Old Highway 8 and 8th Avenue intersection to support the planned redevelopment in the area. <br />The proposed intersection improvements include: <br /> <br /> Reconstruction of the Old Highway 8 and 8th Avenue NW intersection including construction of <br />a traffic signal. <br /> Reconstruction of Old Highway 8 and 8th Avenue NW roadways to the extent necessary to <br />transition the intersection geometry into the existing roadway sections of Old Highway 8 and <br />8th Avenue NW. <br /> Construction of concrete sidewalks to improve connectivity along and across Old Highway 8. <br /> Stormwater BMP improvements to meet NPDES and RCWD treatment requirements.
The URL can be used to link to this page
Your browser does not support the video tag.