My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.04.28 CC Packet
NewBrighton
>
Council
>
Packets
>
2020
>
2020.04.28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:46:03 AM
Creation date
3/1/2021 1:19:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary: Murlowski Properties Inc is seeking to clean up the legal descriptions of their <br />properties to facilitate a current sale of the Belair Building, and future <br />sale/redevelopment of the larger undeveloped parcel currently utilized <br />(primarily) for aggregate recycling. No new uses or changes to uses would be <br />authorized as a result of these applications. <br />Specific requests being considered as a single package for approval on <br />4/28/20 are as follows: <br />Preliminary & Final Plat – needed to authorize filing of the new plat which <br />amends legal descriptions to clean up gaps and overlaps with surrounding <br />properties…necessary to facilitate current and future property transfers. <br />Variance – needed as the new plan will maintain the existing <br />nonconforming 30’ right-of-way frontage for Lot 1, while providing for a <br />new potential accesss via Outlot A which does not fully front on Lot 1. <br />Site Plan Amendment – needed to document that Outlot A could be used <br />for roadway purposes in conjunction with future development. <br />SUP Amendment – needed to amend previous conditions of approval with <br />the following effects: <br />o Would allow chimney area of Lot 2 to be used for roadway purposes if <br />needed in the future. <br />o Future road construction through the chimney would need to protect <br />existing vegetation in as much as possible. <br />o A formal easement would need to be dedicated over the outlet for <br />Rush Lake. <br />o Outlet upgrades to occur when Lot 2 develops, or once grant funding is <br />secured to implement the change…final funding to be determined. <br />Both the Planning Commission and staff are recommending approval of all <br />requests. <br />Attachments: 1) Staff report <br />2)Applicant’s materials & narrative <br />3)Draft resolution <br />_______________________ <br />Ben Gozola, AICP <br />Assistant Director of Community Assets and Development
The URL can be used to link to this page
Your browser does not support the video tag.