My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.04.28 CC Packet
NewBrighton
>
Council
>
Packets
>
2020
>
2020.04.28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:46:03 AM
Creation date
3/1/2021 1:19:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Murlowski Industrial Park Preliminary & Final Plat, SUP & Site Plan Amendment, and Variance <br />City Council Report; 4-28-20 <br /> <br /> <br />Page 6 <br />(cont.) An existing storm sewer line bisecting the property will be placed within a 20 drainage <br />& utility easement. Staff and the applicants agree this outlet pipe for Rush Lake will <br />likely need to be improved and relocated in the future, but the details for such a change <br />have yet to be worked out. Both parties are committed to finding a win-win solution <br />to the outlet location and alignment in the future. <br /> <br />Resident <br />Concerns & <br />Feedback: <br /> No comments have been received as of 12-27-19 <br />INFRASTRUCTURE: <br />In General: No new infrastructure will be required at this time as the purpose of the plat is solely <br />to clean up existing legal descriptions. <br /> <br />Streets and <br />Transportation: <br /> No new streets are needed at this time. <br /> <br />Water <br />System(s): <br /> No changes to water infrastructure are required as part of this plat. <br /> <br />Sanitary <br />System(s): <br /> No changes to sanitary sewer infrastructure are required as part of this plat. <br /> <br />Storm water / <br />Grading / <br />Erosion: <br /> No changes to storm sewer infrastructure are required as part of this plat. <br /> <br />Development <br />Phasing: <br /> Further development of the land and/or changes to uses would occur in the future, and <br />would be subject to further review and approval through a separate permitting process. <br /> <br />Utilities: No changes to on-site utilities are proposed. <br /> If/when changes occur, all new utilities (i.e. telephone, electric, gas service lines, etc) <br />are to be placed underground in accordance with the provisions of applicable City <br />ordinances. <br /> <br />Lighting: No changes to lighting are required or proposed as part of this plat.
The URL can be used to link to this page
Your browser does not support the video tag.