My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.09.08 WS Packet
NewBrighton
>
Council
>
Packets
>
2020
>
2020.09.08 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:46:10 AM
Creation date
3/1/2021 11:15:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Function:ADMINISTRATION <br />Dept Project Name Justification Useful Life <br />Central Services <br />City Hall Carpet City Hall carpet will include all flooring (including tentant space)10 <br />City Hall Doors (blank)40 <br />City Hall Furniture (blank)25 <br />City Hall Signage City Hall signage was refaced and illuminated with LED lights in 2016 10 <br />Elections <br />Accuvote Precinct Tabulators (9) Equipment for each precinct used to cast and tabulate votes ‐ need to stay in <br />compliance with State & Federal statutes as well as ADA requirements. <br />10 <br />Auto Mark Ballot Markers (9) <br />with tab <br />Equipment for each precinct used to cast and tabulate votes ‐ need to stay in <br />compliance with State & Federal statutes as well as ADA requirements. <br />10 <br />Info Tech <br />Cable & Council Chambers <br />equipment <br />Video projector is used in every meeting in the Council Chambers for <br />presentations by staff to the viewing audience. <br />5 <br />Computer Replacements #50097 The City budgets annually for upgrades and replaces older computers that are <br />reaching the end of their projected expectancy. Within the IT Master Plan, the <br />City purchases 10 new computers a year for higher end users and replaced <br />ones are rotated to other users that are in need of an upgrade. <br />1 <br />Conference Room Equipment <br />(City, Woods, PSC)(blank) <br />5 <br />ER‐Electronic Recordkeeping <br />System & Server <br />The City budgets annualy for potential costs associated with maintaining the <br />City's backup server. If the servers would fail and the backup system was not <br />operational the City may lose valuable data that could not be recovered. <br />10 <br />ER‐Record Management The City budgets annualy for replacing or updaing the record management <br />system. The City does not utilize this funding source unless the Laserfiche <br />system is in need of repair or replacement. <br />10 <br />Ipad #50095 Ipad fleet has grown and will require a yearly replacement to keep the fleet of <br />devices current. <br />1 <br />Mailroom Copier The Mailroom copier is the main printer and copier for City Hall Staff. The <br />copier has expanded paper trays for large print jobs. It is also used to scan <br />documents for electronic filing and or reporting. <br />7 <br />Network Equipment <br />Replacements #50099 <br />The City budgets annually for replacing network server equipment used to <br />operate the City's IT infrastructure. The City has begun to update the server <br />system to VMWARE equipment. The City does not utililize the funding unless a <br />server of the network needs repair or replacement. <br />1 <br />Network Server #50098 The City budgets annually for replacing network server equipment used to <br />operate the City's IT infrastructure. The City has begun to update the server <br />system to VMWARE equipment. The City does not utililize the funding unless a <br />server of the network needs repair or replacement. <br />1 <br />Phones Over 200 Voice over IP telephones are currently in use all throughout the City <br />Buildings. This system allows staff to make and receive phone calls over the IT <br />network. The system is fully computerized and backed up nightly. <br />10 <br />Postage Machine Postage machine is used daily and is an essential piece of equipment.10 <br />Printer Replacements #50096 The City budgets annually for replacement printers. The funding is not utilized <br />unless one of the existing printers is not repairable and must be replaced. <br />1 <br />SAN 60%The City budgets for replacement of the Storage Area Network every five <br />years. 60% of this is allocated to the general fund, and 40% is allocated to <br />Public Safety for the evidence management system (Arbitrator). <br />5 <br />Security Cameras & Software The City budgets annually for replacing security cameras, software, and <br />licensing. The City does not utilize this funding source unless the existing <br />security system is in need of repair or software upgrades. <br />7 <br />Security System <br />Upgrade/Replacement <br />Four of the six City buildings have keyless access controls, security cameras <br />and equipment that records those cameras which require maintenance and <br />upkeep to provide security in or around buildings. <br />7 <br />City of New Brighton <br />Capital Improvement Plan <br />2021 thru 2030 <br />Asset Details <br />21 <br />DRAFT COPY
The URL can be used to link to this page
Your browser does not support the video tag.