My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.12.08 CC Packet
NewBrighton
>
Council
>
Packets
>
2020
>
2020.12.08 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 9:46:06 AM
Creation date
3/2/2021 9:41:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Brighton 2021 Fee Schedule BUILDING PERMITS: Description 2020 2021Site Assessment for Fire Works $100.00 $100.00Temp Membrane Structure, Tents & Canopies - Greater than 120 Sq Ft$88.50 $88.50Demolition$79.00 flat fee for residential, valuation based for non-residential with $79 minimum fee$79.00 flat fee for residential, valuation based for non-residential with $79 minimum feePLUMBINGSump pump inspection$63.00 $63.00Plumbing permit issuance charge Minimum $52.50 or 1.5% of project cost or which ever is greater Minimum $52.50 or 1.5% of project cost or which ever is greaterWater Heater$52.50 $52.50Water Softener$52.50 $52.50RPZ (Backflow Device) $58.00 $58.00Administrative Fee$17.00 $17.00Commercial Plan Review FeeCity will review plans that are valued less than $1,500.00. City will review plans that are valued less than $1,500.00.State Surcharge Fee.0005% x valuation of job (minimum fee = $1.00) .0005% x valuation of job (minimum fee = $1.00)MECHANICALMechanical permit issuance fee$47.50 $47.50Mechanical Permit1.5% of contract cost 1.5% of contract costResidential New Construction; 1 & 2 family dwelling$132.50 $132.50Furnace$47.50 $47.50Gas/Electric Range$47.50 $47.50Gas Piping$47.50 $47.50Air Conditioning$47.50 $47.50Gas Line / Fireplace$68.00 $68.00Other$47.50 $47.50Commercial & IndustrialMaximun of $47.50 or 1.5% of the improvement cost whichever is greaterMaximun of $47.50 or 1.5% of the improvement cost whichever is greaterTemp heat permit$105.00 $105.00Commercial Plan Review Fee45% of Permit Fee 45% of Permit FeeAccelerated review (Total x 2) Review completed within 15 business days or ½ of the submitted fee refundedAdministrative Fee$17.00 $17.00State Surcharge Fee.0005% x valuation of job (minimum fee = $1.00) .0005% x valuation of job (minimum fee = $1.00)GENERAL WORK: BUILDING/FIRE SPRINKLER AND ALARM FEES (Continued)
The URL can be used to link to this page
Your browser does not support the video tag.