Laserfiche WebLink
New Brighton 2021 Fee Schedule BUILDING PERMITS: Description 2020 2021BUILDING MOVING FEESPre-inspection fee$79.00 $79.00Moving Principle Building into City$316.00 $316.00Moving over private property$31.00 $31.00Moving over public streetsLarger than 12 ft high, 14 feet wide, 25 Feet long$79.00 $79.00No larger than 12 feet high, 14 feet wide, 25 Feet long$42.00 $42.00EXCAVATING / GRADING FEES50 cubic yards or less$44.50 $44.5051 to 100 cubic yards$51.50 $51.50101 to 1,000 cubic yards*$50.00 for first 100 cubic yards, plus $11.00 for each additional 100 yards or fration thereof.$50.00 for first 100 cubic yards, plus $11.00 for each additional 100 yards or fration thereof.1,001 to 10,000 cubic yards$175.00 for first 1000 cubic yards, plus $9.00 for each additional 1000 yards or fration thereof.$175.00 for first 1000 cubic yards, plus $9.00 for each additional 1000 yards or fration thereof.10,001 to 100,000 cubic yards$287.00 for first 1000 cubic yards, plus $42.00 for each additional 10,000 yards or fration thereof.$287.00 for first 1000 cubic yards, plus $42.00 for each additional 10,000 yards or fration thereof.100,001 + cubic yards or more$697.50 for first 100,000 cubic yards, plus $24.00 for each additional 100,000 yards or fration thereof.$697.50 for first 100,000 cubic yards, plus $24.00 for each additional 100,000 yards or fration thereof.* Over 100 Cubic Yards is required to pull a SWWPP PermitAdministrative Fee$17.00 $17.00OTHER INSPECTION FEESInspections outside of normal business hours *$95/Hr. $95/Hr.(Minimum charge - two hours)Reinspection fees $79/Hr. $79/Hr.Inspections for which no fee is specifically indicated$79/Hr. $79/Hr.Additional plan review required by changes,$79/Hr. $79/Hr.Additions or revisions to plans (Minimum charge one hour)Change of address.$42.00 $42.00* Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages fringe benefits of the employee involved.