My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.04.20 PC Packet
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2021
>
2021.04.20 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 4:22:46 PM
Creation date
4/16/2021 2:51:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUP & Site Plan Amendment: Clearscape Landscaping <br />Planning Commission Report; 4-20-21 <br /> <br /> <br />Page 13 <br />(cont.) 2. The applicant shall work with staff on ingress/egress requirements for staff <br />and customers as part of and following any reconstruction/reconfiguration of <br />the Old Highway 8 corridor <br />3. Lighting on the site and building shall be directed downward and be installed <br />so as to prevent direct light from being detectable at all lot lines. Lighting is <br />also not to shine directly into the public right-of-way. Any problems with <br />existing lighting that are later identified shall be brought into compliance with <br />code requirements. <br />4. The applicants shall provide a narrative of spill control practices for <br />equipment stored near creek, and come to an agreement with DCAD staff on <br />final mitigation measures to contain and prevent materials from leaving the <br />site and entering the creek/ditch as may be needed both now and in the future. <br />5. The applicant shall obtain all needed permits from the Rice Creek Watershed <br />District (RCWD), and agree to address storm water concerns if unforeseen <br />issues arise (or become foreseeable) as a result of the on-site storage. <br />6. The applicants shall provide spot elevations and a grading/drainage plan for <br />proposed employee parking lot for staff approval prior to the improvement <br />being made. Drainage created by the proposed parking lot shall not adversely <br />affect neighboring properties. <br />7. The applicants shall stripe the new employee parking lot and customer spaces <br />per the approved plan upon completion of paving. <br />8. The applicants shall provide an updated survey to staff showing on-site <br />utilities, and accommodate minor site changes if directed to do so by the City <br />to protect these utility lines. <br />9. The applicants will provide the fire marshal with updated Material Safety <br />Data (MDS) sheets as may be needed. <br />10. The applicants shall either make improvements to the site to eliminate <br />tracking of dirt into the street, or shall pay for street sweeping services <br />whenever directed to do so by the City. <br />11. Sign changes on the building and/or site will need to be reviewed and <br />approved via a separate sign permitting process. <br />12. If later determined necessary, the applicant shall make minor adjustments to <br />the arrangement of parking spaces and/or storage if it is ultimately determined <br />changes are needed to facilitate large vehicle turning movements. <br />cc: Susan Morrison, Owner; <br /> Wade Gerten, Clearscape Main Contact <br />
The URL can be used to link to this page
Your browser does not support the video tag.