My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.09.07 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.09.07 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 3:30:28 PM
Creation date
12/29/2021 3:11:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of New Brighton <br /> Capital Improvement Plan <br /> 2022 thru 2031 <br /> Asset Details <br /> Function: DCAD <br /> Dept Project Name Justification Useful Life <br /> Public 2013 Chevy Pickup With Snow Truck is used for transporting personnel to job sites,plowing parking lots, 10 <br /> Works Equipment alleys,and treatment plants.It houses all of the sign tools. <br /> 2013 Trackless MT6 Tractor, This is one of two sidewalk machines used for clearing snow from 21 miles of 15 <br /> ribbon blower,vplow sidewalks. <br /> 2014 Doosan DXB100 Breaker The replacement years are determined based on the anticipated life span of 12 <br /> the equipment based on use,wear and tear. <br /> 2014 Felling 24ft Trailer (blank) 15 <br /> 2014 International Dump Truck 15 <br /> Single Axle Used for snow plowing and hauling material. <br /> 2014 John Deere 6125R Tractor 12 <br /> This tractor is used for plowing 40 cul-de-s the south side of the city.The <br /> tractor is fitted with a 16'wide collapsa also has a flail mower used <br /> for cutting boulevards and a salt spr for anti-ic <br /> 2014 Sullair Air Compressor (blank) 16 <br /> 2014 Truck Mounted Pothole The pothole patcher is mount a dump truck for st aving 12 <br /> Patcheron#005 dump truck maintenance operations <br /> 2015 Case Loader/Backhoe The replacement years are d termined based on the anticipated life span of 10 <br /> the equipment based on use,we d tear. <br /> 2015 International 7400 Dump 15 <br /> Truck Used for snow plo ing and hauling ma <br /> 2016 Doosan DX140W The replacement years are determine$based on the anticipated life span of 5 <br /> the equipment based on use,wear and tear. <br /> 2016 Mack Dump Truck Single 15 <br /> Axle/W Plow Used for snow plowing and hauling material. <br /> 2017 Doosan DL220 Front+C78 The replacement years are determined based on the anticipated life span of 2 <br /> End Loader Upgrade+C116 the equipment based on use,wear and tear. <br /> 2017 Elgin Pelican SE Swee 12 <br /> Mech. blank) <br /> 2019 Ford F250 Pick Truck is set up with all the tools for asphalt repair. 10 <br /> 2019 Mack Single Ax k 15 <br /> Truck w/attachments Used fir snow plowing,hauling,water truck,chipping storage <br /> Air handler/heater in truck The replacement years are determined based on the anticipated life span of 25 <br /> e equipment based on use,wear and tear. <br /> Bobcat 576-2 Year Upgrade The replacement years are determined based on the anticipated life span of 2 <br /> the equipment based on use,wear and tear. <br /> Cold Storage Roof The Cold Storage Roof is steel and it will either be re-coated to extend its life 30 <br /> 10 years or it will be replaced. <br /> Doosan Plate Compactor(new) 8 <br /> Replacment of Public Works equipment is determined on the anticipated life <br /> span of the equipment based on use,and wear and tear. <br /> Fleet Software 7 <br /> The Fleet Software enables the Garage to track and maintain the City's fleet. <br /> Furnace/AC for Maint Bldg The AC/HVAC is an in-floor system that will be upgraded to a standard 25 <br /> offices duct/ceiling install <br /> Garage Door Access (blank) 15 <br /> Garage lot paving(West public) 30 <br /> The public parking lot serves contractors and guests of the facility,while the <br /> private lot is used by parks and public works maitenance vehicles <br /> Hot water heaters Hot water heaters have a limited life and this plan includes 10 years for 10 <br /> replacement <br /> Hotsy Pressure Washer The replacement years are determined based on the anticipated life span of 7 <br /> the equipment based on use,wear and tear. <br /> Inger Rand Asphalt compactor Machine is a vibratory roller,used on paving and patching asphalt.Extended 24 <br /> the life out to 24 years. <br /> 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.