My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.09.07 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.09.07 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 3:30:28 PM
Creation date
12/29/2021 3:11:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of New Brighton <br /> Capital Improvement Plan <br /> 2022 thru 2031 <br /> Asset Details <br /> Function: STREET RECONSTRUCTION <br /> Dept Project Name Justification Useful Life <br /> Streets <br /> 14th to 16th near E2 Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> project sheet <br /> 14th to 17th E of SLR Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> project sheet <br /> 19th/20th S of 7th Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> project sheet <br /> Area between SLR&LLR North Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> of 14th St project sheet <br /> Innsbruck Area and 17th- Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> Oakwood project sheet <br /> Mill&Overlay Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> project sheet <br /> Mississippi to Rice Creek Terrace (blank) <br /> Area (blank) <br /> Mounds Avenue&Violet Lane Replacement is part of the C prehensive Street Plan-for more detail see 30 <br /> project sheet <br /> MSA Routes Replacement is part of the Comp sive Street Plan-for more detail see 30 <br /> project sheet <br /> Oakwood Drive&SE Hansen Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> Area project sheet <br /> Pavement Router The Pavement Route for crac sealing and over time it loses its 10 <br /> effectiveness. <br /> Street Sign/Post Upgrade In 2009 all street signs were replaced with reflective logo based signs and we 15 <br /> plan for replacement in 2024. This equipment is used to make the signs and to <br /> install the posts. <br /> West Long Lake&Poppyseed Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> Drive Area project sheet <br /> 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.