Laserfiche WebLink
City of New Brighton <br /> Capital Improvement Plan <br /> 2022 thru 2031 <br /> Asset Details <br /> Function: STREET RECONSTRUCTION <br /> Dept Project Name Justification Useful Life <br /> Streets <br /> 14th to 16th near E2 Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> project sheet <br /> 14th to 17th E of SLR Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> project sheet <br /> 19th/20th S of 7th Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> project sheet <br /> Area between SLR&LLR North Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> of 14th St project sheet <br /> Innsbruck Area and 17th- Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> Oakwood project sheet <br /> Mill&Overlay Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> project sheet <br /> Mississippi to Rice Creek Terrace (blank) <br /> Area (blank) <br /> Mounds Avenue&Violet Lane Replacement is part of the C prehensive Street Plan-for more detail see 30 <br /> project sheet <br /> MSA Routes Replacement is part of the Comp sive Street Plan-for more detail see 30 <br /> project sheet <br /> Oakwood Drive&SE Hansen Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> Area project sheet <br /> Pavement Router The Pavement Route for crac sealing and over time it loses its 10 <br /> effectiveness. <br /> Street Sign/Post Upgrade In 2009 all street signs were replaced with reflective logo based signs and we 15 <br /> plan for replacement in 2024. This equipment is used to make the signs and to <br /> install the posts. <br /> West Long Lake&Poppyseed Replacement is part of the Comprehensive Street Plan-for more detail see 30 <br /> Drive Area project sheet <br /> 56 <br />