My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.09.28 CC Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.09.28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 3:48:40 PM
Creation date
12/29/2021 3:24:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agenda Section: Consent <br /> Report Date: 9/21/2021 <br /> IXIN F� Council Meeting Date: 9/28/2021 <br /> BRIGHTON <br /> building tomorrow today <br /> REQUEST FOR COUNCIL CONSIDERATION <br /> ITEM DESCRIPTION: CONSIDERATION OF COOPERATIVE AGREEMENT WITH METROPOLITAN COUNCIL FOR A <br /> CURED IN-PLACE PIPE UNDR 694. <br /> _DEPARTMENT HEAD'S APPROVAL: Craig Schlichting, Director of Community Assets and Development G65 - <br /> CITY MANAGER'S APPROVAL: \\\\ <br /> No comments to supplement this report Comments attached — <br /> Recommendation: <br /> 1. Authorize the Mayor and New Brighton City Manager to sign/enter into a Cooperative Agreement with <br /> Metropolitan Council for construction and design of a Cured In-Place Pipe under TH 694 in New Brighton. <br /> Legislative History: NA <br /> Financial Impact:The City share of the sewer lining project related to design and construction is estimated to be <br /> $215,926. <br /> Explanation: A large portion of the sewer lines in southern New Brighton rely on a single sewer crossing <br /> under TH 694 located between Long Lake Road and Old Highway 8 NW. The Metropolitan Council will be <br /> reconstructing a sewer interceptor line on the south side of Long Lake which will require bypass pumping to <br /> collect and re-reroute sewer flows around their project. The cost of bypass pumping and piping will be <br /> incurred by the Metropolitan Council. During this time the City has an opportunity to structurally line an arch <br /> pipe that flows under 694. The structural liner will extend the lifespan of the sanitary sewer in the project area, <br /> reduce inflow and infiltration into the sanitary sewer system, and safeguard the City from costly future <br /> excavations which would be needed to make sanitary sewer repairs. <br /> Costs and Funding: The project will be funded from Fund 702, Sanitary Sewer. <br /> Crai G. Schlichting, P.E. <br /> Director of Community Assets and Development <br /> Attachments: <br /> Cooperative Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.