Laserfiche WebLink
PUBLIC WORKS PROJECTS <br /> Department: Sanitary Sewer <br /> Item: Replace Lift Station # 7,Install new pumps and controls <br /> Year(s): 2020, 2040 <br /> Cost: $200,000-2020 <br /> $361,200-2040 <br /> (See Foth report"Lift Station Needs" filed with City Project 13-9) <br /> Description: This work includes installing new pumps and controls in this lift station. <br /> The wet well is part of the original station that was installed in 1961. The pumps and <br /> controls were replaced in 1985. This project would replace pumps and controls that <br /> would be over 30 years old. <br /> Justification: Lift Station #7 is our largest and busiest pump station. It is in constant <br /> use, and a breakdown of our wet well or the force main cannot occur without extreme <br /> problems and probable damage to households along that line. The wet well was <br /> rehabilitated and relined in 2009 as a part of a new forcemain project from Lift Station 7 <br /> to Stowe Avenue. <br /> I <br /> ►ury .vry <br /> C r n,�1 <br /> 1 Cia <br /> Cat1/44.2 <br /> ' r <br /> YI\; <br /> ALARM ON gyp\ <br /> tI EIEV.•B8B.00 _ <br /> my EEv:88T.00_-E"� 1111' <br /> • A •• <br /> p. _L.L.ON IL <br /> D <br /> • • FM.BL.LOPE ' • ° 1_ <br /> t° • ELEK.885OO (11 <br /> • ' 1 D' °• r S • X,'-ELEv.=883.08 <br /> TYPICAL SECTION FOR LIFT STATION <br /> Nor To scut <br /> 32 <br />