My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.11.08 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.11.08 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 4:18:09 PM
Creation date
12/29/2021 3:54:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> Department: Sanitary Sewer <br /> Item: Replace Lift Station 8, Install new pumps and controls <br /> Year(s): 2024, 2044 <br /> Cost: $190,000 2024 <br /> $333,000 2044 <br /> (See Foth report "Lift Station Needs" filed with City Project 13-9) <br /> Description: This work includes installing new pumps and controls and total <br /> replacement of this lift station. The pumps and controls are original from the early <br /> 1960's with minor replacement of parts over the years. This project would replace <br /> pumps and controls that would be over 60 years old. <br /> Justification: This lift station is small and serves a small number of properties. <br /> However, the lift station is showing signs of age. This project will install new pumps and <br /> controls that are modern, energy efficient, and the City will be able to get parts for <br /> repairs. <br /> 1 <br /> i fir- <br /> . <br /> in E /�, <br /> Illp <br /> Lift Station 8 <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.