My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.11.08 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.11.08 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 4:18:09 PM
Creation date
12/29/2021 3:54:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> Department: Sanitary Sewer <br /> Item: Install new pumps and controls for Lift Station 1 <br /> Year(s): 2028 (Lift Station 1) <br /> 2048 <br /> Cost: 2028-$214,000 <br /> 2048-$375,000 <br /> (See Foth Report"Lift Station Needs" filed with City Project 13-9) <br /> Description: This work includes installing new pumps and controls in this lift station. <br /> The pumps and controls are original from the early 1960's with minor replacement of <br /> parts over the years. This project would replace pumps and controls that would be nearly <br /> 60 years old. <br /> Alternate Plan: During the 2016 reconstruction of County Road E2 the City placed <br /> gravity sewer to the west in the possibility of connecting the flow from Lift Station 1 <br /> directly to Lift Station 23. <br /> Justification: This lift station is small and serves a small number of properties. <br /> However, the lift station is showing signs of age. This project will install new pumps and <br /> controls that are modern, energy efficient, and the City will be able to get parts for <br /> repairs. <br /> Vialir,. re <br /> i <br /> Lift Station 1 <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.