Laserfiche WebLink
<br />FEB-07-2006 13=51 BARR ENGINEERING <br />02/07/2006 13:49 FAX 952 466 5525 WICKENHAUSER EXC <br /> <br />9528322601 P.01/07 <br />III 001 <br /> <br />'. <br /> <br />. <br /> <br />Change Order No.1 <br /> <br />Northw~!it Quadrant - thase 211elnolltlon ,I'rojcct <br />City of New BrigMon, Minnesota <br /> <br />Hate 01' lssmmcl;!: <br />Owner: <br />Project Nu,: <br />Conln\ttor: <br />)j~lllPnccl': <br /> <br />February 7. 200(i <br />Ciry of New Brighton <br />23/62-489 2006334 <br />Wickl,mhauscr Ex.cavating, 1ne_ <br />Barr Engineering Cornpany <br /> <br />The CONTRACTOR is hereby directed to make the following changes in the Contract DOCI,l-lnel1ts: <br /> <br />. <br /> <br />1, Additional Aghestos COlltailling Material Abatement ut 1427 Old Highway 8 <br /> <br />Description: CONTRACTOR was directr::d to remove asbestos containing tl'ansite at the Anoka Co-op <br />Prop~rty located at 1427 Old Highway X, <br /> <br />Reason fllr Change; .Dl11ing building demolition, CONTRACTOR identified a second layer ofasbest',s <br />containing transitc beneath a wall inlhe upper level of the Co-op otliee- Only the HI'st layer oftransite was <br />identified in the Pre-Demolition Asbestos ;md HazardouS Materials Survey and Assc$$ment Report incluo.cd <br />in tile Contl'act Documents. An addiLilmal 640 S~lllare feet of tl"ansite was abated fl'Offi the building. The <br />presence of the transite could not have been reasunably anticipated in the original bid. <br /> <br />Change in Contract "rice: The Contract Price will be increased by the total of $2, 112,00 for completion of <br />this work. <br /> <br />Altaclllnclit~: Propo$ttl from CONTRACTOR. <br /> <br />2. AddltiQnal A!lhestos Containing Material Abatement at 1201; 1209, & 12ll"Old flighway 8 <br /> <br />Description: CONTRACTOR was directed to remove asbestos conlaltling vermiculite at the Lange <br />Proper'ties located at 1201. 1209. and 1211 Old HighwliY 8. <br /> <br />Rca~"n for Change: During building demolition, CONTRACTOR identitied asbestos cOT\t<linins <br />vermiculite insulation insid~ concrete block walls that was not identified in the Pre-Demolition Asbestos and <br />Hazardous Materials SliNey and Assessment Report included in the Clmtrnct DOCl,lments. The: Pl.esence of <br />the vermiculite could not have been reasonably anticipated in the original bid. <br /> <br />Change In ContrnctPrice: T~c: Contract Price will he increased by the total of$1,610.00 foI' compteeiOll of <br />this wlJrk. <br /> <br />Attachments: Proposal from CONTRACTOR. <br /> <br />3. Stage Il )'.-opcrty, Asbestos Abatcmellt and RegulatedlHazardous Waste Removal at 1300 Old <br />Higbway 8 <br /> <br />Description: CONTRACTOR is directed to provide iLbatement and regl,ll;l.ted/hazirrdous waste removal <br />services at the Kilkenny l'roperty located at 1300 Old Highway 8. <br /> <br />Reason tor Change: The building at 1300 Old Highway 8 was occupied at the time the Contract <br />Douuments were prepared; therl::fore, dC$tI'uctive asbestos samples required to complete a Pre-Demolition <br />Asbestos and Hazardous Materials Sllrvey and Assel;1sment Report could 110t be obtained. At the direction of <br />the ENGINEER, CONTRAGl'OR submitted a demolition bid <1s$uming a 'clean' b1Jilding, fi-cc: l)fasbc$tos <br />contllininc materials and I'cgulatcd/hazaTdous wastC,'L The pre~DeTTlolition A~bestos and ]-Inzardous <br /> <br />r~l.2..l\(I::!\.1 ~"\i!.OI,JS IK:llIo1 [lkll,\C(,ntr...~(. DOt;"mQnl.i;\C'I~II,~Cf)rdNnl_DO(" <br /> <br />Page 1 M2 <br />