Laserfiche WebLink
<br />FEB-07-2006 13:51 BRRR ENGINEERING <br />02/07/2006 13:49 FAX 952 466 5525 WICKENHAUSER EXC <br /> <br />9528322601 P.02/07 <br />1ilI002 <br /> <br />. <br /> <br />. <br /> <br />Ml1tedo.ls Survc;y and ASSeSSTlH::nL Report was COlllpletctl in JanLlary 2006 at)er the huilding WlIS vlLcated. <br />The change in contract price tor Ihis item includes lahor. r.:quipment, and materials required to l'elUove and <br />dispose o1'the a:;bcstos and rCl>ulate(.L'hazardous waste ide:ntified in th~ January 2006 report. <br /> <br />Ch:lI1gc in Contract Price: The Contract Price will be inareas~d by the total (~f $39,614.00 for CIlmpletion <br />of this work. <br /> <br />Attachmcntli: Proposal fi'om CONTRACTOR and their s\lbcontractor Twell Environmental, Inc. <br /> <br />.-:..':":'--............. <br /> <br />._~:..i-~ <br /> <br />.~.~. <br /> <br />,....-., I -. <br /> <br />CHANGE IN CONTllACT PRICE: <br /> <br />Contract Price prior to this Change Order: $. 37L3QQ.JlL <br />Net incrl;:Olse (dt:en::ase) ofthis Change Order: $ 43.336.00 <br />El'timatt:d Contract Price with all approved Chang~ Orders: $ 4 t 4.636.00 - <br /> <br />l{ECO~F.l~y <br /> <br />By: r--'1 <br />Sara Garfin, BaiT, <br /> <br />ngineeling Com:pony (ENGINEER) <br />d- . 0 1- ~ 0 (9. <br /> <br /> <br />. <br /> <br />ACCE~ /J III 11f) <br />By:__ _~ / VIr: <br />J Ann Wickeohauser, Wickenhauser F.xcavatil~g. Inc. (CONTRAC:TOR) <br />Date: <br /> <br /> <br />Date: <br /> <br />I_--~~- <br /> <br />Al'PROVEll: <br />By:~ <br /> <br />David Black, City of New Brighton (OWNER) <br />Date:_, <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />. <br /> <br />I <br />J <br />, <br /> <br />I" ~,::!J'6:!\.Iijj'\~tJUS Dc";,,) liL;,m\Cunl fllll.1 I)Ot:lJlll~nUil\CNt1r,cOn:lNa 1 ,J)(')C <br /> <br />I>agc 2 of 2 <br />