Laserfiche WebLink
<br />FEB-07-2006 13:51 BARR ENGINEERING <br />02/07/2006 13:49 FAX 952 466 ~~25 WICKENHAUSER EXC <br /> <br />9528322601 P.01/07 <br />141001 <br /> <br />'. <br /> <br />. <br /> <br />Change Order No.1 <br /> <br />Northwest Quadnnt ,- :Phase Z llemolltlon ,Project <br />City of New Brighton. Minnesota <br /> <br />Bate of issuance: <br />Owner: <br />Project No,: <br />Conlnlctor: <br />)<~llgil1ccr: <br /> <br />Febl1,lary 7. 200(i <br />City of New Rrighton <br />23/62-489 1.006 334 <br />Wickcnhauscr Excavating, loc. <br />Burr Engineering Company <br /> <br />The CONTRACTOR is h$rcby directed to make Lhc tblIowing changes in the Contract Documents; <br /> <br />. <br /> <br />1. Addition",' Aghestos Containing Material Abatement at 1427 Old Highway 8 <br /> <br />Description: CONTRACTOR was directt:d to remove asbestos containing ttansite at the Anoka Co-op <br />Property located al: 1427 Old Highway R, <br /> <br />R(Jason fur Change: Dm;ng building demolition, CONTRACTOR identified a sccond layer of asbestos <br />containing transit!: beneath a wall in the upper level of the Co-op otlicl!:. Only the first layer oftransltt was <br />identified in toe Pn:-Demolition Asoestos and Hazardous Materials Survey and Asses$ment R~PQrt includcd <br />in the Co~tl'act Documents, An additll)nnl 640 s~lLlare fcet of transite was abated from the building. The <br />pn::l'lencc of the transite CQl,lld not hl1ve been rcasl)nably l1nticipatel.l in the orisinal bid. <br /> <br />Change in Contract Price: The Contract Pl"ice will be increased by the: t01al of $2, 112.00 for completion of <br />this work. <br /> <br />;Utaclllncnts: Proposal from CONTRACTOR. <br /> <br />2. AdditiQnnl AsheMos Containing Material Abatement at 1201, U09, & 1211 'Old Highway 8 <br /> <br />Ddc..-iption: CONTRACTOR was directed to remOve asbestos contail~ing v.;:,miculite at the Lange <br />Properties located at 12()I, 1209, and 1211 Old Highway 8, <br /> <br />RCllSllll foi' Change: During building demolition, CONTRACTOl{ Idenlilied asbestos corlti:ljJ}jng <br />vermiculite ins\Jlation inside concrete block walls that was not identified in the Pre-Demolition Asbestos and <br />,Hazardous Materials Sllt'vey and Assessment Report included in the C(111tnwt Documents. The: pl'esencc of <br />the vermiculite could not have been reasonably anticipated in the original bid. <br /> <br />Chang~ in Contrnct Pdce: The Contract Price will he increused by thc total 01'$1,610,00 fOJ' completion of <br />this work, <br /> <br />Attachments: Proposal from CONTRACTOR. <br /> <br />3. Stage 11 Property, Asbestos Abatcmellt al1d RegulntedfHaZflrdl)us Waste Removal at 1300 Old <br />Htgbwny 8 <br /> <br />Description: CONTRACTOR is directed to provide abatement and regl,l'lated/hazardous wll:!ite removaJ <br />services at the Kilkenny Property ll)cated at 1300 Old l-lighway 8. <br /> <br />Reason for Chlloge: The building at 1300 Old Highway 8 was occupied at the time the Contract <br />Douuments were pn:parcd; tnercfore, dcsti'Uctive llsbestos samples required to complete: a Pre-Demolition <br />Asbcstos and Hazardous Materials SLINey and Assel'Jsment Report could not be obtained. At the direction of <br />the ENUlNIlER, CONTR1\c:rOR s\Jbmitted a demolition bid aS$uminc: a 'clean' b\Jilding, frce l)fasbcstos <br />containing: materials and regulated/hazardous wastes. The Pre-Demolition Asbestos und HazardouS <br /> <br />F:\2.~\rI::!\.1 "9\..~~S IPir.:mOl rl~(\II,\Cc,ntr"'l:il. DI)r,:H'1~nli;\C'I~nf~)tdNt)I-[X)C- <br /> <br />l'age 1 or 2 <br />