My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.04.18 PC Packet
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2023
>
2023.04.18 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 3:43:39 PM
Creation date
1/2/2024 1:39:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Plan Review: Totem Pole Park Rehabilitation <br />Planning Commission Report; 4-18-23 <br /> <br /> <br />Page 6 <br />Conceptual Site <br />Plan Updates: <br />According to the 2040 Park and Trail System Master Plan, the Totem Pole park <br />redesign was envisioned to include: <br /> An open air picnic shelter with permanent restrooms with option for medium-sized <br />Neighborhood Center Building. <br /> Playground area with seating. <br /> Full basketball court and Bankshot with seating area <br /> Four pickle ball courts with seating/spectator area. <br /> Improved ballfield with trail route, expanded spectator area and drainage. <br /> A paved 8’ wide trail loop. <br /> Off-street parking lot with 39 stalls. <br /> Improved accessibility and compliance <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.