My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.10.10 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.10.10 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:37:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />8 <br /> Interstate 694 bisects the entire city separating it into two distinct north‐south <br />districts. Existing connections across the interstate are not optimized for pedestrians <br />or bicyclists and often feel unsafe <br /> Interstate 35W runs along the eastern border of New Brighton and most of the bridges <br />crossing it were replaced in 2015‐16 with additional pedestrian facilities (with the <br />exception of CR D) <br /> Various railroads bisect the community and safe crossings are difficult <br /> Water features, including Long Lake, create physical barriers to moving around the <br />city, but are also destinations that should be accessible via bike and on foot <br /> County Roads and Local streets with unsafe or non ADA compliant crossings <br /> https://www.newbrightonmn.gov/205/ADA‐Transition‐Plan <br /> Draft
The URL can be used to link to this page
Your browser does not support the video tag.