My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.10.10 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.10.10 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:37:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />25 <br /> Boulevard trees <br /> Stormwater features <br /> Street width of 32 feet to 40 feet <br />o Two travel lanes without pavement markings <br />o Parking along one side if necessary <br />o Bicycle lanes on both sides <br />o Sidewalk on one side or on both sides if conditions/space allow <br /> <br />Proposed Biking Facilities <br />The Framework documents included in the beginning of this plan offer guidance/recommendations <br />on where bike lanes exist and where additional bike facilities should be installed. Existing ROW <br />dimensions and traffic volumes help staff identify where a painted bike lane is adequate vs. where <br />protected facilities should be installed. Protected bike lanes are facilities that are located beyond the <br />curb line or separated from traffic. To aide in future plan preparation staff has updated the bike plan <br />to include the following locations: <br /> <br />Protected Bike Lanes <br />2026 Innsbruck – Silver Lake Road to Fridley <br />2026 Garden View Apartments (over future storm sewer pipe)‐7th St NW to 10th Street <br />2026 7 <br />th Street NW ‐ 8th Avenue NW to Silver Lake Road <br />2032 Mississippi – Long Lake Road to Fridley <br />2030 Foss Road – Old Highway 8 to 16 <br />th Avenue NW <br />2033 5 <br />th Street NW – Hansen Park to Fridley <br />2034 5 <br />th Street NW – Old Highway 8 to Hansen Park <br />2038 14 <br />th Street NW – Silver Lake Road to Long Lake Road <br />2039 5 <br />th Avenue and 1st St NW ‐ Old 8 to Old 8 (connects E2 and Old 8) <br />2048 Service Drive – Silver Lake Road to Pike Lake Trail <br /> <br />County Roads <br />Old Highway 8 – Highway 96 top County Road D <br />County Road E – Old Highway 8 to Columbia Heights <br />10th Street NW – 694 to Old Highway 8 <br />Cleveland Avenue – County Road E2 to County Road D (E2 to RR Bridge may be painted) <br />Count Road H – County Highway 10 to Stinson <br /> <br />Painted Bike Lanes <br />2030 29 <br />th Avenue NW – Rice Creek Road to 16th St <br />2030 16 <br />th Avenue NW – County Road E to Silver Lane <br />2031 29 <br />th Avenue NW – 16th St to Brookshire Draft
The URL can be used to link to this page
Your browser does not support the video tag.