My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.11.14 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.11.14 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:39:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> <br />Department: Water <br /> <br />Item: Re-painting Forestdale Water Tower <br /> <br />Year(s): 2025 <br /> <br />Cost: 2025 – $670,000 <br /> 2024 - $82,000 Plans and Specifications <br /> <br />Description: The 300,000 gallon Forestdale Water Tower is located at the northwest <br />corner of Silver Lake Road and Forestdale Road. This tower was built in 1955. The last <br />maintenance was a complete interior and exterior blast and repainting in 2001. This <br />tower underwent minor interior / exterior repairs and coating touch-ups in 2013. This <br />tower will be due for a complete paint project in 2025. The coating systems of today are <br />better quality then when this tank was repainted. It is expected this paint job will last 20 <br />to 25 years. The inside will be coated with an epoxy coating, and the outside with a <br />polyurethane finish. <br /> <br />Justification: This is scheduled tank maintenance. <br /> <br /> <br />Forestdale <br />Water Tower <br />17
The URL can be used to link to this page
Your browser does not support the video tag.