My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.11.14 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.11.14 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:39:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> <br />Department: Water <br /> <br />Item: Re-painting 5th Street Storage Tank Reservoir <br /> <br />Year(s): 2021, 2041 – Total Reconditioning <br /> <br />Cost: 2041 – $1,622,000 <br /> 2040 - $129,000 Plans and Specifications <br /> <br /> <br />Description: The 1,300,000 gallon ground storage reservoir is located next to the <br />PGAC Plant. This tower was built in 1961, with maintenance of a complete interior and <br />exterior blast and repainting in 2002 and 2021. In 2002, This tower was painted and the <br />coating system was changed from epoxy/urethane to an Ameron PSX 700. This change <br />in coatings represents about a 20% increase in the coating life and a retained glossy <br />appearance for 24 years compared to about 12 years for the epoxy/urethane. <br /> <br />Justification: This is scheduled tank maintenance. <br /> <br /> <br /> <br />5th Street <br />Storage <br />Reservoir <br />18
The URL can be used to link to this page
Your browser does not support the video tag.