My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.11.14 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.11.14 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:39:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> <br />Department: Sanitary Sewer <br /> <br /> <br />Item: Provide On-site generator to Lift Station 23 <br /> Lift Station 23 Pumps and Controls <br /> <br /> <br />Year(s): 2036 – Generator Replacement <br /> 2056 – Pump and Control Replacement <br /> <br /> <br />Cost: 2036 $119,000 <br /> <br />Description: This work includes providing a new stationary generator onsite. The <br />project would also include engineering, installation, a transfer switch and testing. <br /> <br />Justification: These previous lift stations were small and served a small number of <br />properties. With the new station a larger capacity wet well was installed at a greater <br />depth than the previous stations. With these improvements, it is likely that any potential <br />sewer back-up would be limited. However, with a stationary generator the risk would be <br />eliminated. <br /> <br /> <br /> <br />Lift Station 23 <br />36
The URL can be used to link to this page
Your browser does not support the video tag.