Laserfiche WebLink
PUBLIC WORKS PROJECTS <br />Department: Sanitary Sewer <br /> <br />Item: Replace Lift Station # 7, Install new pumps and controls <br /> <br />Year(s): 2020, 2040 <br /> <br />Cost: $200,000-2020 <br /> $386,000-2040 <br />(See Foth report “Lift Station Needs” filed with City Project 13-9) <br /> <br />Description: This work includes installing new pumps and controls in this lift station. <br />The wet well is part of the original station that was installed in 1961. The pumps and <br />controls were replaced in 2020. <br /> <br />Justification: Lift Station #7 is our largest and busiest pump station. It is in constant <br />use, and a breakdown of our wet well or the force main cannot occur without extreme <br />problems and probable damage to households along that line. The wet well was <br />rehabilitated and relined in 2009 as a part of a new forcemain project from Lift Station 7 <br />to Stowe Avenue. <br /> <br />37