My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.11.14 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.11.14 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:39:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br />Department: Sanitary Sewer <br /> <br />Item: Replace Lift Station # 7, Install new pumps and controls <br /> <br />Year(s): 2020, 2040 <br /> <br />Cost: $200,000-2020 <br /> $386,000-2040 <br />(See Foth report “Lift Station Needs” filed with City Project 13-9) <br /> <br />Description: This work includes installing new pumps and controls in this lift station. <br />The wet well is part of the original station that was installed in 1961. The pumps and <br />controls were replaced in 2020. <br /> <br />Justification: Lift Station #7 is our largest and busiest pump station. It is in constant <br />use, and a breakdown of our wet well or the force main cannot occur without extreme <br />problems and probable damage to households along that line. The wet well was <br />rehabilitated and relined in 2009 as a part of a new forcemain project from Lift Station 7 <br />to Stowe Avenue. <br /> <br />37
The URL can be used to link to this page
Your browser does not support the video tag.