My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.11.28 CC Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.11.28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:40:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8) Rebuild Peerless 12‐LD‐6 stage bowl assembly <br /> Replace bowl shaft, bearings, and wear rings $ 5,650.00 <br />9) Provide(2‐4)each 1”x 20’ PVC tubes @ $3.50/ft (replacing upper 40’ & reinstalling removed) $ 280.00 <br /> <br /> <br />Additional materials recommended for replacement <br /> Replace 10"x 10' T & C drop pipe (19 each) @ $1,375.00 $26,125.00 <br /> Replace 10”x 10’ tail pipe @ $1,100.00/ea $ 1,100.00 <br /> Replace 10”x 5’ T & C drop pipe (2 each) @ $980.00/ea $ 1,960.00 <br /> Replace 31 each 1.94”x 2.5” rubber line shaft bearings @ $35.00/each $ 1,085.00 <br /> Replace Base/Head shaft 1.68”x 65.5” (we can flip the shaft) <br /> Recondition Discharge head bearing and packing $ 550.00 <br /> Replace 8” Lakewood Bleed‐back flow control valve $ 1,500.00 <br /> Replace 31 each 1.68 x 1.94 Stainless steel line shaft sleeves @ $130.00/each $ 4,030.00 <br /> 17 each 10” bronze spider assembly @ $230.00/each $ 3,910.00 <br />TOTAL PROJECT RECOMMENDED AMOUNT $68,190.00 <br /> <br />Well Information: <br />SWL 204’ Well Casing Depth 446’ Current Well Depth 495’ Original Depth 505’ <br />Well Pump Information: <br /> Pump setting 310’ Column 10”x 1‐11/16” Pump Peerless 12 LD‐ 6 stage: 900 Gpm @ 466’ TDH <br /> <br />This amount was higher than my original estimate and I don’t know what kind of issues this will cause, but it may be best for <br />City representation to make a site trip to our shop and go over the components with us. this way you can visualize our <br />recommendations for replacing each component. I have included the test results along with the copy of the video report along <br />with this letter so you have all information. Either way you should review all data and give me a call to discuss our findings. <br /> <br />As you are aware the above amount does not include any sand removal. It is only to recondition the well pump back to new, as <br />general preventative maintenance. <br /> <br />If you have any questions, or require additional information, please do not hesitate to contact at (612) 479‐3121, or my cell <br />(612) 369‐3652. <br />Sincerely; <br />BERGERSON CASWELL INC. <br /> <br /> <br />Tim D. Berquam <br />Project Manager/Geologist
The URL can be used to link to this page
Your browser does not support the video tag.