My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.11.28 CC Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.11.28 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:40:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ave Le "tz;l'/+ <br />e)/I NEW <br />BRIGHTONbuilding tomorrow today <br />Ocl4th,2023 <br />Visu-Sewer <br />Todd Selmacher <br />19587 Tamarack St. NW <br />Oak grove, MN 55011 <br />The city of New Brighton Public Works Department is requesting price quotations for the following work listed <br />below. lf you are interested on quoting prices please return emailto derek.miller(@newbrightonmn.govorfax 651- <br />638-21,74 or by mail to: Derek Miller, Supervisor of Public Works, 700 5th St NW New Brighton MN 55112 <br />Quotations are to be completed and returned by Nov 20thh, 2023 al2:OOpm The City reserves the right to award <br />the work to the lowest responsible bidder or the bidder offering the best value. All prices to remain the same for <br />one year from date of acceptance of quote. <br />Sealing of pipes with full liners: 1'71 ' <br />8" liner- MH to MH <br />1-4" liner-MH to MH-47- <br />$ per foot <br />Approximately 3,079 ft of 8" full liners MH to MH. lnstall lining with cured in place process of polyester felt material <br />saturated with a thermosetting resin and inserted into existing sewer lines. ln accordance with the American <br />Society for Testing and Materials (ASTM) standards such as F-12I6, D-368, and D-790. lt is the responsibility of the <br />installer to clean the line prior to lining. After the pipe has been reconstructed, existing service connections in the <br />repaired area will be reconnected, without excavation. Upon completion, a video tape showing the completed <br />work including the restored conditions and a written report of correction and procedures will be furnished. <br />ToTAL cost of installing wyes, and lining MH to MH: 5 /e0, /og ' <br />-' <br />eUO et€ 5JA^4 eA <br />All work is to be completed by tUyZ(,2024.Therewill be 10% penalty it work and video submission is not <br />completed by due date. Failure t6 meet this deadline may result in loss of future quoting opportunities. lf you have <br />any questions regarding the above work, please contact Derek Miller, Supervisor of Public Works at 651-638-21-12 <br />or Kim Public Works Office Assistant at 651-638-2111. <br />700 5th Street NW New B MN 55112 651-638-2111 www.newb htonm
The URL can be used to link to this page
Your browser does not support the video tag.