My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-15-2006
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 03-15-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2008 3:12:48 PM
Creation date
3/10/2006 3:25:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCHEDULE E <br /> <br />PUBLIC IMPROVEMENTS <br /> <br />Group A <br /> <br />Responsibility <br /> <br />. Building demolition and removal of demolition debris, basements and <br />t CI.ty <br />pavemen ................................................. ............. ................ .............. ............... <br /> <br />. Removal of piles, construction debris and imbedded concrete on <br />MW A Site... ................. ............ ......... ........... ....................................... m........... Redeveloper <br /> <br />. Environmental remediation for the appropriate land use in accordance <br />with the Approved DRAP (to be performed by the Redeveloper with <br />City oversight)........... ......................... .................................................... ........... Redeveloper/City <br /> <br />. Removal of other existing improvements on the Redevelopment <br />Property (excluding watermain and sanitary sewer)......................................... Redeveloper <br /> <br />. Design of utility and storm water management plans....................................... City <br /> <br />. Design of jointly approved preliminary street, grading and stormwater <br />pollution prevention (SWPPP) plans for rough grading and elevations ........... Redeveloper <br /> <br />. Rough grading.............. ..... ............................................................ .... ................ Redeveloper <br /> <br />. Private utility removals, as required ................................................................. Redeveloper <br /> <br />. Geotechnical work to support the land uses and approved site plans <br />(excluding geotechnical testing for installation of streets to be <br />constructed by City and utilities) ...................................................................... Redeveloper <br /> <br />. Wetland delineation and mitigation efforts identified by the City and <br />implemented by the Redeveloper, with City oversight and direction) ............. Redeveloper/City <br /> <br />. Watershed application submitted by the City with Redeveloper <br />assistance......... ..... ........................................................ ................... ........ .......... City/Redeveloper <br /> <br />Group B <br /> <br />. Finalizing utility and storm water management plans ...................................... City <br /> <br />. Coordination and facilitation of County upgrades to Old Highway 8, <br />to be done by City with Redeveloper assistance and in accordance <br />with jointly approved plans for such upgrades .......................... ....................... City/Redeveloper <br /> <br />. The streets identified on Schedule D as those to be constructed by the <br />City, including curb and gutter, lighting, streetscape amenities, and <br />trails and sidewalks to be located within the public right of way, and <br />dedicated utility easements ............... ... ................ ...... ................. .......... ......... ... City <br /> <br />. Public and private utility relocation, including removal or burying of <br />overhead power and utility lines, ifpossible..................................................... City <br /> <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.