My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-15-2006
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 03-15-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2008 3:12:48 PM
Creation date
3/10/2006 3:25:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. Offsite Disposal of Contaminated Water from 1201 Old Highway 8 <br /> <br />Description: CONTRACTOR is directed to dispose contaminated water that was discovered in an <br />abandoned sump below the former Lange property building at 1201 Old Highway 8. The estimated quantity <br />of contaminated water is 300 ga1l0ns. <br /> <br />Reason for Change: The presence of these items was not known prior to demolition, as so their disposal <br />was not included in the original scope of work outlined in the Contract Documents. Additional items were <br />discovered below the floor slab during demolition and could not have been anticipated in the original bid by <br />the Contractor. <br /> <br />Change in Contract Price: Disposal of the contaminated sump water shall be measured per 55-ga1l0n drum <br />container and sha1l be paid at a Unit Price of $325 per 55-gallon drum of contaminated water. The Contract <br />Price will be increased by an estimated total of$1,950.00 for completion of this work. <br /> <br />Attachments: Proposal from CONTRACTOR and the disposal facility Onyx Environmental Services. <br /> <br />CHANGE IN CONTRACT PRICE: <br /> <br />Contract Price prior to this Change Order: $ 414.636.00 <br />Net increase of this Change Order: $ 47.215.50 <br />Estimated Contract Price with all approved Change Orders: $461.851.50 <br /> <br />:CO~D/~ <br /> <br />Sara Gaffin, Barr Engmeering Company (ENGINEER) <br />~-8"Ol.D <br /> <br />Date: <br /> <br />ACC~PTED: ( <br />By: .JjfJt.v I1.1,.A ~ <br />Paul Wickenhauser, Wickenhauser Excavating, Inc. (CONTRACTOR) <br />Date: 3 - 9 .... 0 6 <br /> <br />APPROVED: <br />By: <br /> <br />David Black, City of New Brighton (OWNER) <br /> <br />Date: <br /> <br />P:\23162\489\2005 DemolitionlContract DocumentslChangeOrdNo2.DOC <br /> <br />Page 2 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.