My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-13-2006
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 06-13-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2006 5:42:32 PM
Creation date
6/9/2006 3:37:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />most cost effective manner because of KHA's understanding and history with the Northwest <br />Quadrant. A rough cost estimate for the reconstruction of Old Highway 8 is $1.5 to $2 million. <br />KHA's proposal of $28,600 for preliminary design services is less than 2 percent of the overall <br />projected project cost. This is very reasonable and less than typical for similar services of other <br />County State Aid Highway projects. <br /> <br />Once a final layout and streetscape concept is approved, staff will determine if the final design <br />and project specifications can be done in-house or outsourced to professional design consultant. <br />This will depend upon the City projected 2007 workload. If the project is outsourced, staff will <br />solicit a proposal for final design services from several professional firms as originally requested <br />and approved at the May 9, 2006 Council Meeting.. <br /> <br />A <br /> <br /> <br />Grant M. Wyffels, P. <br />Director of Public Works <br /> <br />Attachments <br />Resolution <br />Proposal/Letter Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.