My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-10-10
NewBrighton
>
Council
>
Minutes - City Council
>
Minutes 2000
>
2000-10-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2005 1:53:06 PM
Creation date
8/5/2005 2:39:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />Council Minutes - October 10,2000 <br />Page 4 <br /> <br />Public Hearinl!. continued <br /> <br />Motion by Samuelson, seconded by Gunderman, to WAIVE THE READING AND <br />ADOPT THE RESOLUTION ORDERING PAYMENT OF CITY'S SANITARY <br />W A TERMAIN SYSTEM IMPROVEMENT COSTS ON PROJECT 99-1 FROM <br />THE WATER UTILITY FUND. <br /> <br />3 Ayes - 0 Nayes, Motion Carried. <br /> <br />Project 99-3 consisted of alley reconstruction and sanitary sewer system improvements on <br />alleys in the general area of Old Hwy 8 from 8th Ave. to 13th Ave., between 5th St. and 7th <br />St. The work consisted of removal of existing surfacing and base, grading, new <br />bituminous surface, repair of four sanitary sewer mains, and replacement of an existing <br />retaining wall on 6th St. The final project cost is $227,405,90 and is divided as follows <br />$97,215,21 (City cost) and $130,190.690 (special assessments). <br /> <br />The assessment is based on a lineal foot basis with a total of 16,254.39 lineal feet in this <br />projcct. The lots abutting alleys will be assessed $8.01 per lineal foot. One exception is <br />two lots which will be assessed only for that portion oftheir lot which abut the actual <br />length of the alley. <br /> <br />There were no comments from the audience. <br /> <br />Motion by Samuelson, seconded by Gunderman, to CLOSE THE HEARING. <br /> <br />3 Ayes. 0 Nayes, Motion Carried. <br /> <br />Motion by Samuelson, seconded by Gunderman, to WAIVE THE READING AND <br />ADOPT THE RESOLUTION APPROVING SPECIAL ASSESSMENTS FOR <br />PROJECT 99-3, HANSEN PARK ALLEY RECONSTRUCTION. <br /> <br />3 Ayes - 0 Nayes, Motion Carried. <br /> <br />Motion by Samuelson, seconded by Gunderman, to WAIVE THE READING AND <br />ADOPT THE RESOLUTION ORDERING PAYMENT OF CITY'S SANITARY <br />SEWER COSTS AND 25%. OF THE ALLEY RECONSTRUCTION COSTS OF <br />PROJECT 99-3, HANSEN PARK ALLEY RECONSTRUCTION, FROM THE <br />SANITARY SEWER UTILITY FUND. <br /> <br />3 Ayes - 0 Naycs, Motion Carried. <br /> <br />Motion by Samuelson, seconded by Gunderman, to WAIVE THE READING AND <br />ADOPT THE RESOLUTION ORDERING PAYMENT OF THE RETAINING <br />W ALL REPLACEMENT COSTS ON PROJECT 99-3, HANSEN PARK ALLEY <br />RECONSTRUCTION, FROM THE CONTRACT MAINTENANCE FUND. <br /> <br />3 Aycs - 0 Nayes, Motion Carried. <br /> <br />Public Hearing <br /> <br />2000 Spccial <br />Assessment Project <br />99-1 and Project 99-31 <br />Resolution 00.091 <br />Resolution 00-092 <br />Resolution 00-093 <br />Resol ution 00~094 <br />Resolution 00-095 <br />Resolution 00-096 <br />Resolution 00-097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.