Laserfiche WebLink
<br /> <br />STAFF Al'iALYSIS (co NT.) <br />. Rezoning (cont.) <br /> <br />. <br /> <br />. <br /> <br />treated the same as road right-of-way in that it isn't zoned. The City, therefore, should not <br />consider a re-zoning request, unless and until the railroad is abandoned. <br /> <br />Site Plan Review <br /> <br />Building Setbacks <br /> <br />The proposal does not include any existing or proposed buildings. The applicants' narrative <br />mentions use of a loader, feeder and a series of conveyors which transport material to and from <br />various stockpiles. Additionally, crushing and screening plants are used to process material and <br />this machinery is portable. The applicants' site plan does show the location of two separate <br />"production facilities areas". It is assumed that these are the location of the crushing and <br />screening plants and would therefore need to meet the following required building setbacks: <br /> <br />Most Northern "Production Facilities Area" <br /> <br />Setbacks REQUIRED PROPOSED <br />Front (north) 40' 74' <br />Rear (south) 20' 42' <br />Side (east) 15' 365' <br />Sidc (west)* 60' 660' <br /> <br />'Because this side is adjacent to a residentially zoned area (although developed as a Regional <br />Park) a more restrictive setback is imposed. <br /> <br />Most Southern "Production Facilities Area" <br /> <br />Setbacks REQUIRED PROPOSED <br />Front (north) 40' 375' <br />Rear (south) 20' 70' <br />Side (east) 15' N/A due to lot line <br /> confi\!urations <br />Side (west)** 60' 414' <br /> <br />Both areas depicted as "Production Facilities Area" meet required building setbacks. <br />