Laserfiche WebLink
<br />.v <br /> <br />~ Mr. Douglas Differt <br />December 21, 1981 <br />Page 3 <br /> <br />" <br /> <br />Barr Engineering; project manager is Bob Obermeyer. The <br />project has been reviewed by Hickok Associates (Peter Willenbring <br />and Bill Weidenbacher) which is the consulting engineering firm <br />to the Rice Creek Watershed Commission. The stormwater design <br />has met with their strong approval. <br /> <br />The City of New Brighton'has developed astormwater retention <br />area that it feels will benefit the City, the quality of <br />waterways downstream, and reduce flooding potential on the <br />Interstate right-of-way. The' City is willing to be flexible <br />in the design of elements affecting the Department of Transportation, <br />and to work with your staff to arrive at a mutually beneficial <br />arrangement. <br /> <br />Sincerely, <br /> <br /> <br />J&F:~e-:~ <br /> <br />City Manager <br /> <br />) <br /> <br />) <br />