Laserfiche WebLink
<br />MEMORANDUM <br /> <br />DATE December 9, 1982 <br /> <br />TO <br />FROM <br /> <br />James F. Winkels, <br /> <br />Director of Community Developm~ <br />Director of Public Works ~ <br /> <br />Leslie J. Proper, <br /> <br />SUBJECT: NEW BRIGHTON MEDICAL CENTER PROJECT <br /> <br />We are aware of the Twin Cities Army Arsenal forcemain sewer which <br />crosses the proposes Medical Center site. We have been working <br />with Mr. Tom May of the Arsenal who has provided information on <br />the forcemain and field locations. <br /> <br />The location and grade of the Arsenal forcemain will necessitate <br />some minor changes in the site plan prepared by Barr Engineering. <br />We have already redesigned the 36 inch storm sewer. (See attached <br />plan sheets) The parking lot grades over the forcemain will also <br />have to be changed and I will provide you with a revised parking <br />lot grade for the builders architect. <br /> <br />mh <br />