My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-28-2006
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 11-28-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 5:14:14 AM
Creation date
11/22/2006 4:03:53 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />New Brighton, MN <br /> <br />November 8, 2006 <br />Page 6 <br /> <br />. 3.16 Require that filter and piping be cleaned and disinfected per AWWA and State Plumbing <br />Code guidelines prior to start-up <br />3.17 Coordinate and assist with start-up <br /> <br />Task 4-,- Contract Close Out <br />3.18 Request and obtain final Operation and Maintenance manuals for contractor provided <br />equipment. <br />Request and obtain final copies of as-built drawings and sketches from contractor <br />Assist with training of operators <br />Prepare construction punch lists to expedite project completion <br />Provide notification to City of New Brighton and contractor of potential liquidated <br />damages <br />Fully execute and bring closure to any liquidated damages issue <br />Recommend final payment to contractor upon project completion <br />Notify surety of final payment and commencement of warranty period <br />Prepare final Record Plans <br /> <br />3.19 <br />3.20 <br />3.21 <br />3.22 <br /> <br />3.23 <br />3.24 <br />3.25 <br />3.26 <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.