Laserfiche WebLink
<br />Page 4 <br /> <br />10. <br /> <br />11. <br />12' . <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />3. <br /> <br />Building Setbacks: he proposed addition would be setback 32 <br />feet from the 8t Avenue NW right-of-way and 16 feet from <br />the south proper y line. The required street yard setback <br />in an industrial zoning is 40 feet. An 8 foot variance <br />along 8th Avenue NW is being requested. The variance is <br />needed because t e building addition cannot be moved <br />further to the e st and the applicant cannot meet his <br />needs with a sma ler building. The building cannot be <br />moved further ea t because the sanitary sewer cannot be <br />relocated any fu ther to the east. The variance will <br />align the propos d addition with the current building on <br />8th Ave. NW and lake the proposed addition even with the <br />south property 1 ne. There will be a 36 foot front yard <br />l.andscaped area onsistent with the Highway 8 Corridor <br />Plan. The 16 fo t side yard setback complies with the <br />district standar s. <br /> <br />Parking Setbacks: ihe existing rear yard parking will be <br />expanded and mee all the I-1 setback requirements. . The <br />current side str et yard parking area north of the <br />existing buildin is nonconforming. <br /> <br />4. <br /> <br />5. Total Parking: 167 paces <br /> <br />6. Stall Size: <br /> <br />9' x 20' <br /> <br />7. Aisle Size: <br /> <br />22' <br /> <br />8. <br /> <br />Total Drives: The iroposal is to add a fourth driveway to <br />the site. This ,ourth driveway is a one-way drive off 8th <br />Avenue NW primar'ly for truck traffic to the rear of the <br />proposed additiog. The fire department favors the addi- <br />tional which will provide complete access around the site. <br /> <br />Drive Size: The 4ew driveway off of 8th Avenue NW will be <br />14 ft. wide one~lay drive primarily for truck traffic. <br /> <br />Concrete Curbing: ~he new driveway off of 8th Avenue NW will <br />tle curbed as required. <br /> <br />Parking Area surfaceJ Bituminous <br /> <br />Truck Bays: There WiJl be three truck bays, one at the rear of <br />each of the threj buildings. <br /> <br />Exterior Storage: Jo exterior storage is' proposed. The <br />applicant has stlted thesemi~trailer they are currently <br />using for storag will be removed from the site. <br /> <br />Landscaping:The appl'cant is proposing to plant two large <br />Norway Maples, a d 10 small Blaauws Juniper. <br /> <br />Impact on surroundinJ Land Uses: Tenants of the Print Craft <br />building to the south are currently leasing land from <br />Micom for parkin. with the construction of Micom's new <br />building additio , Print Craft tenants will no longer be <br /> <br />9. <br />