My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-225
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-201-299
>
LP-225
>
LP-225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 4:29:46 AM
Creation date
12/4/2006 10:28:57 AM
Metadata
Fields
Template:
House File
Address
475 8TH AVE NW
House Number
475
Street
8TH
Street Type
AVE
Direction
NW
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RCWD Meeting Minutes: 1-27-88 <br /> <br />Page 2 <br /> <br />and clean them as recOIIIrended, and wants to transfer IL/CDL Project funds and <br />get the White Bear-Bald Eagle-Otter Lakes NPS Project started. Scott would like <br />to see if the District could do something to upgrade Spring Lake because it is <br />intensely used recreationally, with swinIoors getting the "itch" from it. Sande <br />wants the 509 Plan to continue on and get approved, and also wants to maintain <br />established coommication with cities and assist them in lIDderstanding what we <br />" are trying to accomplish. <br /> <br />3. Ditch cleaning projects for completion before Spring. Weidenbacher distributed <br />two naooranduns to the Board from Dale Claridge, EAR, regarding Judicial Ditches <br />2 and 3 Maintenance Work. After discussion, the Board directed Inspector to rennve <br />a beaver dam in Judicial Ditch 2 (Hardwood Creek) at approx. station 424+00 and <br />directed Engineer to get estilIla.tes on rEiIDval of two abandoned 66-inch RCP culverts <br />on El.ner Carlson property as well as removal of an obstruction completely blocking <br />charmel on JaIOOs Gregoire property and bring it back to Board 2-10-88. <br />After discussion of recOIIIrended work in Judicial Ditch 3 (C1ea:rwater Creek), <br />Savage IOOved, supported by Wi1lcoxen, to have Engineers get quotes from 4 contractors <br />for rennval of abandoned culverts from main channel downs tream of Bald Eagle Lake <br />outlet and excavating a channel through 500-foot section of marshy area along Branch <br />iff'+. south of Cedar Street, plus other channel repairs on JDfft3 and AnCo Ditch #47 which <br />include sediment rennval from culverts, miscellaneous channel cleaning, rennva1 of <br />abandoned culverts and appliances, etc., for total cost up to $47,500. Carried. 5-0 <br /> <br />4. Scott armolIDced receipt of bill for dues in the Minnesota Association of <br />Watershed Districts, and IOOved approval of paynent in arIDlIDt of $570.00 for 1988 <br />nanhership in the Association; seconded by Wi1lcoxen. Carried. 5-0 <br /> <br />5. Cardinal explained his contact with Representative Quinn, requesting his assist- <br />ance in getting the RCWD bill through the Tax Conmittee. <br /> <br />6. Savage questioned why the Board IOOves to suspend the Rules of Procedure at each <br />neeting. Response: Agenda order is proscribed in the By-Laws of the Board of <br />Managers. The Rules of Procedure are suspended in order to serve people in attendance <br />first, rather than make them sit through a large portion of the meeting. <br /> <br />REPORl' OF THE TREASURER: <br />None. <br /> <br />REPORl' OF THE ATl'ORNEY: <br />None. <br /> <br />REPORl' OF THE ENGINEER: <br />1. Consent Agenda. It was IOOved by Sande and seconded by Scott to ratify the <br />following Pennit Applications in accordance with the District Engineer 1 s Reconmenda- <br />tion, as contained in the Engineer's Revised Report dated January 27, 1988: 87-146, <br />87-167, 87-170. Carried. 5-0 See Attachment 1 for details and Board action. <br />It was IOOved by Sande and seconded by Scott to table the following item: 88-04 <br />as recOIIIrended by the District Engineer in the Engineer's Revised Report dated <br />January 27, 1988. Carried. 5-0 See Attachment 2 for details and Board action. <br /> <br />2. Pennit Application, Project Review exhibits and recOIIIrendations were given by <br />Engineers Woods and Weidenbacher on the following items: 87-163, 88-02, 88-06, <br />88-08, 88-01, 88-03, 88-05, 88-07, 87-119,*86-111, 87-117, 87-160 and 88ROl, 88R02. <br />See Attachments 1 through 3 for details and Board action. *Board directed that a <br />letter clearly stating their displeasure with Applicant's m:mner of procedure with <br />this project be prepared for President Cardinal's signature by Torpe. <br /> <br />3. Re-schedule IL/CDL Final Report. Upon request by Engineer Weidenbacher, this <br />Report was re-scheduled to 2-18-88 Meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.