Laserfiche WebLink
<br />December 23, 1980 <br /> <br />City of New Brighton <br />Planning Department <br />803 - 5th Avenue N.W. <br />New Brighton, MN 55112 <br /> <br />Attention: Joan Archer <br /> <br />Dear Joan: <br /> <br />In reference to your letter of 12/18/80, we feel that we have not been <br />negligent of your conformities put upon us by the city council. We <br />have continued construction throughout this entire season to comply <br />with our original drawings, which were not meticulously detailed. At <br />that time the city council made an example of our efforts to operate <br />a business in New Brighton by making unprecedented demands on building <br />design and placement. These demands have already placed overwhelming <br />hardship on our time and finances. <br /> <br />We have not forgotten our original ideas. We do not feel that our <br />property has the finished look we desire. As we have built, we have <br />come up with some definite improvements that enhance the appearance <br />and physically improve efficiency. We realize the fact that we are <br />not finished yet. We also know the city has been lenient with our <br />efforts, however timely they have been. <br /> <br />We have always tried to work and cooperate with the Planning Dept. of <br />the city, and in this case we feel it is our obligation to continue <br />to do so. It is our intent to meet each and everyone of those <br />connnitments. <br /> <br />We propose to do the following in conjunction with your letter: <br /> <br />1) We will designate and assign a handicapped parking space within <br />30 days. <br />2) We will install a brick veneer on the lower portion of the West <br />side of the building from the midpoint to the North end per our <br />original plans. This work cannot be completed until the frost is <br />gone. It will be completed by June 1, 1981, weather permitting. <br />3) Installation of our split rail fence will be completed as soon as <br />weather permits and will be in accordance with original plans. <br />4) We have secured the materials to construct the fencing, and this <br />will be installed as soon as weather permits. <br />5) Installation of crushed rock in the storage area is a complete <br />l80-degree request of us since approval of our building permit. <br />We were told the only acceptable covering of the ground was a <br />"dustless surface", and this did not even include oil-covered <br />