My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-087
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-001-100
>
LP-087
>
LP-087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 3:36:18 AM
Creation date
12/8/2006 12:55:15 PM
Metadata
Fields
Template:
House File
Address
581 8TH AVE NW
House Number
581
Street
8TH
Street Type
AVE
Direction
NW
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- 3 - <br /> <br />5) The additional storage structure will be taken down, and we will <br />put much less expensive and less aesthetic-looking plastic over <br />our firewood at your request. <br /> <br />6) This area was a matter of indecision from the start, but we were <br />told that every square foot of our property would have to be <br />either grass, dustless surface or building, and in this case we <br />chose a dustless surface. <br /> <br />We realize that we have not been able to construct our establishment <br />on a timely basis with everyone's schedules. <br /> <br />We cannot fully accomplish all requirements in your letter at this time <br />only because of weather conditions, but we will and without extra <br />prodding complete our intended goals as we have stated within 6 months' <br />time, weather permitting. ' <br /> <br />Our situation is such that we cannot wave a magic wand and things <br />happen, but we offer this, that we will not deviate to a lesser any <br />plans originally submitted to the council. <br /> <br />/ <br /> <br />Our certificate of occupancy is a very important step for our corpora- <br />tion. We have to disagree that much progress has not been made to [/ <br />comply with our plans. In fact, we feel we have accomplished quite <br />bit from an old, white shack and weeds. We have placed 750 yards of <br />sod and over 1000 sq. ft. of concrete parking area, and built a 24 x 48 <br />building, all within 15 months of issuance of our permit. We have <br />approximately 50% of the fencing up, and the goodwill we have estab- <br />lished for the trade area in only 9 months has had a definite effect <br />on the immediate downtown New Brighton commercial area. <br /> <br />We offer our total cooperation in this matter in the hopes that both <br />the City Planning Dept. and New Brighton Small Engine Service, Inc. <br />will be able to work out an agreeable working partnership. <br />
The URL can be used to link to this page
Your browser does not support the video tag.