Laserfiche WebLink
<br />June 15, 1979 <br /> <br />APPLICATION FOR BUILDING PERMIT <br />LP-90 HIGHWAY EQUIPMENT REFINISHING <br /> <br />PURPOSE <br /> <br />To examine a request for a building permit for Highway Equipment <br />Re fi n ish in g. <br /> <br />BACKGROUND <br />APPLICATION: <br /> <br />Highway Equipment Refinishing <br />David Strafe1da <br /> <br />LOCATION: <br /> <br />309 Old Highway #8 <br />(Generally east of Old Highway #8, north of <br />Bell Lumber & Pole Company and south of <br />D&laria Transfer Inc.) <br /> <br />1-2, Heavy Industrial <br /> <br />ZONING: <br /> <br />COMPREHENSIVE PLAN PROPOSED LAND USE: Light Industrial <br /> <br /> <br />AREA OF SITE: 52,745 s~uare feet <br /> <br />PRESENT USE OF PROPERTY: 2 Vacant Buildings <br /> <br />PROPOSED BUILDING AREA: 8,400 square feet <br /> <br />EXISTING METAL BUILDING: 960 <br /> <br />TOTAL BUILDING AREA: 9,360 <br /> <br />FLOOR-AREA-RATIO: .18 <br /> <br /> <br />PARKING SPACES PROVIDED: 9 <br /> <br /> <br />PARKING SPACES REQUIRED: 9 <br /> <br />The proposal is for a building permit for a 70' x 130' industrial <br />building for Highway Equipment Refinishing. The company's primary <br />operation is truck painting. <br /> <br />The app1~cant presently owns the parcel in question which is 100' <br />x 529.5'. Because of the proposed width of the building and the <br />side yard setbacks required in an industrial district, the <br />applicant will be obtaining an additional 10 feet of land from <br />Bell Lumber and Pole Company along the southern boundary of the <br />property. This land transfer would then make the lot 100 feet in <br />width as indicated by the site plan. The transfer will also involve <br />the applicant transfering the east 50 feet of property to the pole <br />yard. Therefore, approva1"of the building permit application would <br />be contingent on the Council approval of the minor subdivision. <br /> <br />The request for a building permit also includes the relocation of the <br />existing metal building to the rear yard of the property. The <br />applicant has indicated that this building would be used for storage. <br />