My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-09-10
NewBrighton
>
Council
>
Minutes - City Council
>
Minutes 1990
>
1990-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2005 6:44:46 AM
Creation date
8/10/2005 12:49:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />Council Meeting Minutes <br />September 10, 1990 <br /> <br />Page 4 <br /> <br />Council Business, continued <br /> <br />Council Business <br /> <br />The proposed building would be 80 feet wide by 120 feet long, and Construction of Cold <br />have an eave height of 16 feet above grade. The building would be Storage Facility <br />located in the northeast corner of the City garage site. Soi 1 Report 90-195 <br />borings were conducted and conditions are suitable. A portion could <br />be sectioned off for storage and repair of the float. <br /> <br />The proposed building would not be insulated or heated except for <br />the Stockyard Days area in the southwest corner of the building. <br />This area would be about 24 feet wide by 45 feet long. <br /> <br />The estimates for three different building types include: a metal <br />building with a wood frame - $97,200; a metal building with steel <br />frame - $122,000; or masonry and steel building - $199,800. <br /> <br />Staff recommends the metal building with steel frame because it is <br />stronger and superi or to wood and wi 11 provi de more verti ca 1 <br />clearance for loading and unloading of vehicles. <br /> <br />I <br /> <br />In addition to building costs the City will incur architectural fees <br />and the cost to run a watermain for the sprinkling system. Staff <br />recommends retaining Norm Wells for the architectural services and <br />inclusion of a contingency for landscaping and exterior dressing. <br />The total estimated budget for the facility is $145,000. <br /> <br />Proposed funding will be 1/3 from the general fund and 2/3 from the <br />utility funds and spread over a five year period. Staff recommends <br />the same fund split, but spread the costs over a longer period so <br />the annual cost would remain unchanged. Staff will pursue possible <br />contributions from charitable organizations for the float area. <br /> <br />Benke noted that other community organizations will be able to use <br />the float area for storage. <br /> <br />Moti on by Gunderman, seconded by Wi 11 i ams, to RETAIN NORM WELLS <br />ARCHITECT TO PROVIDE ARCHITECTURAL SERVICE FOR A COLD VEHICLE <br />STORAGE FACILITY WITH A METAL BUILDING AND STEEL FRAME, AND PROCEED <br />TO THE PLANNING COMMISSION FOR SITE PLAN REVIEW. <br /> <br />5 Ayes - 0 Nayes, Motion Carried <br /> <br />I <br /> <br />Childs presented the community center summary and noted the Task <br />Force1s goals and objectives of: liTo provide to the residents of <br />New Brighton a comprehensive, multi-purpose center which responses <br />to their recreational, social, and cultural needs." <br /> <br />The Des i gn Team responded to these goals with a des i gn wh i ch <br />satisfies the objectives and is designed to be economical to <br />construct, easy to maintain, and energy efficient. <br /> <br />Content, Financial, and <br />Referendum Report on <br />Proposed Community Ctr. <br />Report 90-196A <br />Report 90-1968 <br />Report 90-196C <br />Resolution 90-076 <br />Resolution 90-077 <br />
The URL can be used to link to this page
Your browser does not support the video tag.