My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-327
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-300-399
>
LP-327
>
LP-327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2007 4:42:25 PM
Creation date
1/16/2007 1:54:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.ft. <br />115? <br />July 18, 1997 <br />Nutec Construction <br />Attn: Rod Bernu <br />3101 Old Hwy 8, Suite 209 <br />P.O. Box 130067 <br />Roseville, MN 55113 <br />ENCROACHMENT - Tech Pro Office Building Park <br />Lines 0803 <br />Section 32, Township 030, Range 23 <br />Dear Mr. Bemu, <br />Northern States Power Company <br />414 Nicollet Mall <br />Minneapolis, Minnesota 554014993 <br />Telephone (612) 330-5500 <br />Our transmission engineers have reviewed the proposed plans for the Tech Pro Office Building Park that were <br />submitted on May 15, 1997. The proposed use of the easement property is acceptable to NSP, subject to the <br />following terms and conditions. <br />1. Fill around or above steel structure foundations is not permitted. The grade around the structures must <br />provide for surface water runoff - no surface water ponding around structures will be permitted. Any cost <br />related to the adjustment of NSP's facilities will be at the requesters expense. <br />2. A working clearance of 20 feet between the electrical conductors and any cranes or digging equipment used <br />in or near the easement, must be maintained at all times. If this clearance cannot be maintained, the <br />contractor or developer must arrange for a line outage by calling NSP's system control department (Carol <br />Andrews 330-6135.) At least two weeks advanced notice must be provided in order to schedule a line outage. <br />There is a fee of approximately $350.00 per day, per outage, for this service. This fee must be paid prior to <br />outage. <br />3. Detailed plans for landscaping (including light standards) must be submitted to NSP for review and <br />approval. Generally shorter varieties of trees and shrubs may be considered. <br />4. There shall be no permanent or temporary building allowed on the easement. <br />Per the phone conversation 1 had with you on July 18, 1997, you indicated that you had more recent <br />plans that place the office building further from the transmission line, than where it had been In your <br />original plans. NSP would like to be provided a new set of plans for our records. <br />To acknowledge receipt of and agreement with the terms of this consent, please sign _the enclosed copy of this <br />letter and return to my attention. <br />Sinc ly <br />! APPROVED <br />Xna son <br />Real Estate Rep./Highway Liaison By: <br />330-5983 <br /> <br />cc: Steve LaCasse <br />Roger Johnson
The URL can be used to link to this page
Your browser does not support the video tag.