My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-349
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-300-399
>
LP-349
>
LP-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2007 3:36:38 PM
Creation date
1/23/2007 3:15:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />PUBLIC WORKS <br />1. Streets: <br />2. Curb Cuts: <br />3. Utilities: <br />4. Easements: <br />5. Grading/Drainage: <br />BUILDING OFFICIAL <br />1. Structure Size: 48,000 square feet <br />2. Structure Height: 29 feet <br />3. Exterior Treatment: Brick Front (Old Highway 8) and precast concrete (ribbed <br /> texture) <br />4. UBC Compliance: Will be required <br />5. Other Considerations: None <br />SANITATION/HOUSING <br />1. Weeds: Rank Growth <br />2. Garbage/Rubbish Enclosures: NA <br />3. Other Considerations: NA <br />PARKS <br />west, as the proposed location may cause some site distance <br />problems for cars and trucks exiting the site. <br />14. Impact on Surrounding Land Uses: Minimal <br />15. Comp Plan Designation: Light Industrial <br />16. Zoning: I-1, Light Industrial <br />17. Other Considerations: None <br />6. Rice Creek Watershed District: <br />7. Environmental Concerns: <br />8. MPCA: <br />9. Other Considerations: <br />No streets are proposed as part of this project. <br />One off of Old Highway 8 & one off of Campus Drive <br />Available <br />None <br />The City Engineer has reviewed the proposed grading plans and <br />have found them to be consistent with the overall grading plan <br />that was approved for the Plat of this area. No changes are <br />recommended. <br />Permit has been obtained as part of the overall Lakeview <br />Business Center (Permit #96-72). <br />None <br />None <br />None <br />1. Proximity of Parks: NA <br />2. Proximity to Community Facilities: NA <br />3. Impact on Parks: Minimal <br />4. Impact on Community Facilities: Minimal <br />5. Other Considerations: None <br />FIRE <br />Hydrant Locations: <br />Existing: Campus Drive <br />Required: Old Highway 8 - north side of drive entrance. The <br />Fire Marshall has reviewed the site plan and requires that a <br />hydrant be installed on the north side of the entrance off of Old <br />Highway 8. <br />Adequate <br />Required on the northeast side of the building. <br />2. Access to Site: <br />3. Y Connection: <br />I:ISHARED\CO UNC IL\REPORTS\1999UNDEQUIT. W PD
The URL can be used to link to this page
Your browser does not support the video tag.