Laserfiche WebLink
<br />, . <br /> <br />continued....page 2 <br /> <br />The final step would involve the addition of sections to the taller tower <br />to bring it to 700' overall in height, provided the FAA will approve this <br />additional height. The purpose of this would be to improve the KTIS-FM <br />service to outlying areas. This would involve some $30,000 in additional <br />investment. <br /> <br />A copy of a plat map showing the tower locations and grounding system radii <br />is attached, as well as a semi-perspective sketch of the proposed installation. <br /> <br />No persons are normally at the site. An engineer will visit it about 3 times <br />weekly for equipment and general inspections, and as necessary for servicing. <br /> <br />It is anticipated that the northerly portion of the land will be. sold off <br />for possible commercial or industrial use along the highway and trackage. <br />A prime potential use would be warehousing facilities. <br />