My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP-077 (2)
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Special Use Permit File PLZ 02100
>
SP 001-100
>
SP-077 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 11:38:33 AM
Creation date
2/8/2007 3:48:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ENVI RONMENTAL STUD IES <br /> <br />PROJECT: <br /> <br />Preparation of an Environmental Assessment <br />Worksheet for Prudential Insurance Company's <br />Pro~osed NCHO Satellite Office in Plymouth, <br />Minnesota ' <br /> <br />CLIENT: <br /> <br />The Architectural Alliance <br /> <br />The project proposed the constrnction of a $17,000,000, 475,000 <br />square foot office facility in the Minneapolis suburb of Plymouth, <br />'Minnesota. BRW prepared this Environmental Assessment Worksheet <br />(E.A.W.) which required in-depth ~nalysisof air quality, noise, <br />transportation, land use, hydrology, and historical and , <br />archeological resources. Also of concern in this project was its <br />potential for initiating premature development on the fringe of <br />the Minneapolis-St. Paul urban service area as defined by the <br />Metropolitan Council. The E.A.W. was completed within a very <br />short time schedule and concluded that a full environmental <br />impact statement was not required. <br /> <br />., <br /> <br />PRO J E CT : <br /> <br />CLIENT: <br /> <br />'-Preparation of an Environmental Assessment <br />Worksheet for West Publishing Company's <br />Proposed Warehouse and Manufacturing <br />Facility <br /> <br />'Rauenhorst Corporation <br /> <br />The-project proposed the construction of an $11,400,000 warehouse <br />and manufacturing facility in two places. The facility was to be <br />located i~ Eagan, Minnesota and would function as a primary <br />printing, binding and warehousing facility for West Publishing, <br />one of the nation's leading publishers of law books. This <br />'Environmental Assessment Worksheet (E.A.W.) was Dne of the first <br />filed in the State using the new worksheet form. The E.A.W. <br />addressed the potential impact on several environmental factors, <br />including: air quality, traffic, water quality, noise, land use, <br />socia-economic factors, and community services. The major <br />concern of this project was the proposed moving of a job center <br />from downtown St. Paul to a suburban .location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.