My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VN-120
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Variance Files PLZ 02400
>
VN 101-200
>
VN-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2007 12:22:14 PM
Creation date
2/20/2007 3:56:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VN-120 -3- June 11, 1974 <br />` t <br />be done. <br />Harty stated that it was not suggested that the concrete <br />be torn up but only that additional plantings be,added <br />in the green area, <br />?Motion by Harty, seconded by Parham, to defer action on <br />VN-120 until the next meeting in order to be able to <br />review a more detailed Motion carried, 4-0. <br />May 21, 1974 <br />The Chairman read the background discussion. <br />Mr.-William Pickering appeared representing the applicant. <br />He stated that the pump islands would be removed and the <br />Concrete leveled off.- He also stated that he considered <br />the plantings by the road to be an alternative to the <br />planters. <br />PLANNING COMMISSION RECOMMENDATION, (May 21, 1974): <br />Motion-by Harty; seconded by Parham, to recommend <br />approval of VN-120 noting that there is parking in a <br />street sideyard involved but that the street is far away <br />and noting also that such recommended approval is <br />conditioned on completion of the Landscape Plan dated <br />April 23, 1974 with the removal of the three Green Ash <br />and two Flowering Shrubs located in,the right-of-way. <br />Motion carried,-3-0.
The URL can be used to link to this page
Your browser does not support the video tag.