Laserfiche WebLink
~ 1980 Capital -2- April 25, 198Q <br />Improvement k'und <br />Hansen Park (Continued) <br />it was decided that it would be more ef~acient to install drain file <br />than to regrade the entire outfield. <br />Rock and draintile $ 550.00 <br />The new softball diamond at 4th Street and 12th Avenue will require <br />a backstop and ag lime for the infield, <br />.Backstop $ $00.00 <br />Ag lime 1,000.00 <br />T-------.:- <br />$1,800.00 <br />The bridge over the creek located east of the shelter is in poor <br />condition, has no guard rails and is quite unattractive. I would <br />recommend that the City purchase the materials and attempt to in- <br />trust a service club in constructing abridge. <br />Materials $2,000.QO <br />The two eastern parking lots are surfaced with gravel and are uncurbed. <br />The City Engineer feels that the smaller of the two lots (4th Street <br />and 12th Avenue) could be surfaced with asphalt and curbed with pre- <br />• cast curbs for approximately $6,000. This would provide parking for <br />fall 1980 and spring '81 use of the eastern portion of the park. <br />$5,900.00 <br />Silver Oak <br />The City has committed $2,000 of the original $15,000 to the St. <br />Anthony School District for playground equipment. <br />$2,000.00 <br />S ununary <br />-T <br />Totem Pole $ 1,200.00 <br />Hidden Oaks 1,300.00 <br />Driftwood 250.00 <br />Hansen 10,250.00 <br />Silver Oak 2,000.00 <br />S $15,040.OQ <br />